Cost Plus Contract For Renovation In Fairfax

State:
Multi-State
County:
Fairfax
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Cost Plus Contract for renovation in Fairfax is a detailed agreement between a contractor and an owner for residential construction projects. This contract allows the owner to pay the actual cost of materials plus a predetermined fee to the contractor for services rendered. Key features include a clearly defined scope of work, specified work site, and stipulations regarding permits and insurance coverage. It emphasizes the owner's responsibility for any additional site work due to soil conditions, as well as the need for written change orders to modify the project scope. The agreement outlines payment terms, addressing late payment penalties and warranty limitations. This form is beneficial for attorneys, partners, and owners as it provides a clear legal framework for renovation projects, ensuring that all parties' obligations and expectations are documented. Associates, paralegals, and legal assistants can leverage this form to assist clients in understanding their rights, preparing for additional costs, and ensuring compliance with local regulations.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

§ 41.1-2-15. Permitting animals to trespass., Article 2. Animal Control and Rabies Control., Chapter 41.1. Animal Control and Care, Code of Ordinances, Fairfax County.

Compliance with a notice of violation notwithstanding, the building official may request legal proceedings be instituted for prosecution when a person, firm or corporation is served with three or more notices of violation within one calendar year for failure to obtain a required construction permit prior to ...

Spouses who have lived apart for six months, have a separation agreement, and have no minor children have grounds to file. If the spouses have not entered into an agreement and/or have minor children, they must be separated for one year before they can file for a divorce on a no-fault ground.

The Conservation Agreement is made between the County and the property owners to ensure proposed measures of conservation are established. This agreement must be signed and notarized by all property owners and is verified by using the County's Tax Records.

If you have technical questions (e.g. account setup, password issues) with PLUS, call 703-324-2222, TTY 711, or email plussupport@fairfaxcounty.

A building permit is required for all new residential, commercial, and industrial construction – including alterations and equipment installations in Fairfax County.

Written by George Washington and George Mason on July 17, 1774, at Mount Vernon, the Fairfax County Resolves were both a bold statement of fundamental constitutional rights and a revolutionary call for an association of colonies to protest British anti-American actions.

Permits are typically required for the following projects: alterations to existing commercial structures; commercial structures; carport enclosures; decks; demolition; electrical systems; finished basements; garages and sheds; HVAC systems; mobile homes; plumbing systems; pools, spas and hot tubs; renovations; ...

So the information here is what is happening now. You can always check with your local permit office for current approval times. For a typical project in Fairfax County (public utilities, no RPA or Flood Zone, no full geotech report required, etc), you can expect your permit to be approved in 4 – 8 weeks.

Trusted and secure by over 3 million people of the world’s leading companies

Cost Plus Contract For Renovation In Fairfax