Construction Site In Building In Alameda

State:
Multi-State
County:
Alameda
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Construction Contract document is essential for establishing a formal agreement between the Contractor and Owner for a project at a construction site located in Alameda. The contract outlines the scope of work, specifying that the Contractor will provide all necessary labor and materials based on the selected plans and specifications. It details the Work Site where the project will take place and mandates that the Contractor obtain all required permits, which are to be paid for by the Owner. Important considerations include the soil conditions at the Work Site, where the Contractor assumes no responsibility, making the Owner liable for any additional site work required. The contract also stipulates insurance requirements and the need for a boundary survey and title opinion from licensed professionals before construction begins. Change orders are formally documented to manage modifications to the project, with direct implications on costs. Payment terms are clearly stated, allowing for either a cost-plus or fixed-fee arrangement, along with provisions for late fees and default payment consequences. Additionally, the warranty provided by the Contractor is limited, emphasizing that workmanship defects must arise within one year of construction completion. This document serves as a vital tool for attorneys, partners, owners, associates, paralegals, and legal assistants to navigate the complexities of construction agreements and ensure compliance with local regulations.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Most construction must take place between a.m. and p.m. during normal weekdays. However, emergency repairs may be performed as necessary.

Construction. The provisions of this section shall not apply to noise sources associated with construction provided the activities take place between the hours of a.m. to p.m. Monday through Fridays or a.m. to p.m. on Saturdays.

Standard start time for construction in California While AM during the weekday and AM during the weekend serve as a general guideline to most cities and counties of California, each city and county has specific regulations on it.

To apply for building permits online, please click on Virtual Permit Center. For assistance using the online portal, please call 510-670-5440 or email permitbid@acpwa.

Generally, construction noise is limited to: Monday to Friday from 7am to 6pm, Saturday from 8am to 6pm, and. Sunday and public holidays from 10am to 6pm.

Report violations to the City of Dallas by dialing 3-1-1 (24 hours - 7 days a week). Construction is limited to 7 AM until 7 PM Monday through Friday and 8 AM until 7 PM on Saturdays and legal holidays, when work is on or adjacent to a residential use as defined in the Dallas Development Code.

Total housing units 31,644 100.0% Occupied housing units 30,226 93.1% Owner-occupied housing units 14,486 48.1% Renter-occupied housing units 15,740 51.9% Vacant housing units 1,418 6.9%101 more rows

NEOM City, known as “The Line”, emerges from Saudi Arabia's vision and epitomises the fusion of futuristic innovation with sustainability. Leading the way in the world's largest construction projects list, the creative vision behind this project really is something!

For County assistance, please call 510.208. 9770 for a menu of County Agencies and Departments. You can also look up telephone numbers in the County Telephone Directory.

For more information please call (954) 630-4350 or email building@oaklandparkfl.

Trusted and secure by over 3 million people of the world’s leading companies

Construction Site In Building In Alameda