A building permit is required for the construction, alteration, or repair of a garage enclosure. Final inspection by the building safety department must be passed for the work to be considered completed by Maricopa County Planning & Development.
Building Permits are issued and finaled with inspections as applicable. A Certificate of Occupancy will be issued upon receiving a final permit. The applicant must obtain a license from the State of Arizona prior to operation of the community residence.
Building: Sidewalks and driveways not more than 30 inches. Painting, papering, tiling, carpeting, cabinets, counter. Temporary motion picture, television, and theater. Shade cloth structures constructed for nursery or agricultural. Window awnings supported by an exterior wall of.
Pinal County Maricopa / County
A building permit is required if you are altering a space. Alterations include relocation, repair or demolition of structural and non-structural walls, changes to mechanical, plumbing, gas or any electrical work. Depending on the scope of work, licensed professionals may be required to prepare your building plans.
Accessory structures greater than 120 square feet for residential structures and 200 square feet for commercial structures shall require zoning administrator approval.
In general, a building permit is required when any structural change or major alteration is made to a building or when any new construction is undertaken. When applicable, separate permits for mechanical, plumbing and electrical work are required. Your proposed project must comply with the zoning code.