Sia Building Contract 2016 Without Quantities In Wayne

State:
Multi-State
County:
Wayne
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Sia Building Contract 2016 without quantities in Wayne outlines the agreement between the Contractor and the Owner for construction projects. Key features include the definition of the scope of work, which encompasses labor and materials for the project, and the specifications set forth by the Owner. The form mandates obtaining necessary permits while emphasizing that the Contractor is not responsible for soil conditions at the work site. Additionally, it covers important topics such as insurance requirements, the process for changes to the scope of work, payment terms, and warranty provisions. The form is designed for ease of completion, allowing users to fill in specific details such as project specifications, fees, and payment schedules. Target users, including attorneys, partners, owners, associates, paralegals, and legal assistants, can benefit from this contract as it provides clear guidelines for construction projects, thereby minimizing disputes and enhancing legal clarity. It serves as a crucial tool for ensuring all parties understand their responsibilities and rights throughout the construction process.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

One of the unique features of the Singapore Institute of Architects Articles and Conditions of Building Contract (“the SIA Contract”) is that the contractor is assured of periodic valuation of works carried out and amounts expressed to be payable in the interim certificates.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

10 Different Types of Contracts Type of ContractEveryday Use Implied Contracts Common in everyday transactions like dining out. Express Contracts Standard in formal business agreements. Simple Contracts Used for straightforward services or transactions. Unconscionable Contracts Often challenged in court for fairness.10 more rows •

There are three main types of contract that use the SIA Conditions, namely: the Lump Sum Contract; Measurement Contract; and. Minor Works Contract.

On the basis of formation, the types of contracts are express contracts, quasi-contract, implied contracts, and E-contract. Based on performance, contract types are executed contracts, unilateral contracts, executory contracts, and bilateral contracts.

The most commonly used standard forms of contract in Singapore are the Singapore Institute of Architects (“SIA”), Real Estate Developers' Association of Singapore (“REDAS”) and Public Sector Standard Conditions of Contract (“PSSCOC”) standard form contracts.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

Trusted and secure by over 3 million people of the world’s leading companies

Sia Building Contract 2016 Without Quantities In Wayne