The Bahamas Building Code was most recently updated in 2003 by the Ministry of Public Works & Urban Development, based on the South Florida Building Code, which is in turn based on the International Codes.
GOVERNMENT AND POLITICAL CONDITIONS As a Commonwealth country, its political and legal traditions closely follow those of the United Kingdom. The Bahamas recognizes the British monarch as its formal head of state, while an appointed Governor General serves as the Queen's representative in The Bahamas.
Street Address or PO Box: The recipient's street address or PO Box number. Settlement or Town: The name of the settlement or town where the recipient resides. Island: The name of the island where the recipient is located. Country: Always include “THE BAHAMAS” in capital letters on the last line for international mail.
SETBACK REQUIREMENTS. - No building shall be ed closer to the front lot line than whichever is the lesser of Twenty-five (25) feet or a distance equal to Twenty per centum (20%) of the average depth of the lot.
(1) When an order that a Company be wound up, or for the appointment of a Provisional Liquidator has been made, the petitioner or his attorney shall cause a sealed copy of the order to be served upon the Company by prepaid letter addressed to it at its registered office (if any) or post office box, or, if there is no ...
A Building Permit is required for all new construction, additions, alterations, including decks, sheds, retaining walls, and fences in The Bahamas as mandated by the Buildings Regulations Act.
Google Maps for displaying property lines, follow these simple steps: Step 1: Open Google Maps. Step 2: Search for the Desired Location. Step 3: Switch to Satellite View. Step 4: Enable the 'Measure Distance' Tool. Step 5: Draw the Property Lines.
SETBACK REQUIREMENTS. - No building shall be ed closer to the front lot line than whichever is the lesser of Twenty-five (25) feet or a distance equal to Twenty per centum (20%) of the average depth of the lot.
The exact amount a building needs to be set back from the property line will vary from one location to another. However, the required setback on the side is typically between 5 – 10 feet, while the front and back require around 10 – 20 feet at a minimum.
The Bahamas Building Code was most recently updated in 2003 by the Ministry of Public Works & Urban Development, based on the South Florida Building Code, which is in turn based on the International Codes.