"Queen's University is situated on Anishinaabe and Haudenosaunee Territory.”
What is Queen's University's email address format? Queen's University's email format typically follows the pattern of First.Last@queensu.ca; this email format is used 91% of the time. Other contacts within LeadIQ's database had email formats such as LastF@queensu.caF.Last@queensu.ca.
To remove a DOB violation from a property record, the condition must be corrected and proof of that correction must be provided to the issuing unit. Visit the Unit Descriptions (link to DOB/Inside DOB/Unit Descriptions) page for the location of each unit. Applicable DOB civil penalty payments must also be made.
DOB NOW Permit Types CodeDescription FO Foundation GC General Construction GC-CX Combined (GC + others) LA Limited Alteration Applications (LAA)8 more rows
PW2: Work Permit Application.
PW1: Plan/Work Application.
L2: Requests for Overrides, Reductions or Waivers of Civil Penalties for Work Without a Permit and Stop Work Order Violations.
Applicants/Contractors withdrawing from a permitted application must: submit a letter of request to withdraw to the Borough Commissioner's office; list corresponding permits; and provide the status of work completed.
Once the project is completed, the owner or the owner's authorized representative must ensure the following items/tasks are completed/submitted prior to project sign-off: completed reports for all the required Special Inspections submitted by SIA's; all required Department inspections are performed; self-certification ...