Oregon law requires that anyone digging in private property or any public right of way call the One Call Center prior to digging. Everyone, contractor and homeowner alike, must call two business days prior to digging. After the call is received, the One-Call Center will notify all affected Operators.
(1) Every operator of underground facilities shall subscribe to the Oregon Utility Notification Center. (2) Any person intending to excavate shall notify the Oregon Utility Notification Center at least two but not more than 10 business days before commencing an excavation.
Dig With Care: If you are digging within 24 inches of the outside diameter of the utility (or tolerance zone ), you are required to utilize hand tools only. Any underground facilities that are in conflict with your excavation must be located with hand tools and protected before power equipment is used.
Using the nationwide 811 number is the first step to get underground facilities located and marked in order to avoid damaging petroleum or natural gas pipes, electric or fiber optic cable, telephone lines, or a water main.
Underground piping systems shall be installed a minimum depth of 18 inches (305 mm) below grade, except as provided for in Section C404.
Who is responsible for maintaining facility locate marks, and how long must they be maintained? excavator must maintain the accuracy of the original marks. The Excavator is required to submit a new locate request if excavation exceeds 45 calendar days from the date the original ticket was submitted.