Construction Site In Building In Utah

State:
Multi-State
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Construction Contract form is tailored for construction projects in Utah, outlining the obligations between the Contractor and the Owner. It emphasizes the scope of work, which includes the provision of all necessary materials and labor for the specified project on the designated work site. The contract mandates that the Contractor secures all required permits and addresses soil conditions, asserting that the Owner must assess site work needs prior to construction. Insurance obligations are clearly stated, ensuring that general liability and worker's compensation are maintained by the Contractor. The form also delineates procedures for changes to the project scope via written Change Orders, along with payment structures under cost plus or fixed fee arrangements. It includes stipulations for late payment and a limited warranty on workmanship. This form serves as an important legal tool for various stakeholders, including Attorneys, Partners, Owners, Associates, Paralegals, and Legal Assistants, as it provides a clear framework for building agreements while ensuring legal compliance and protection of interests.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The Utah Contractors License Requirements Business Entity Registration or SSN. Trade Name. Tax Registration. Pre-licensing Course and State Examination. Proof of Experience. License and Registration Fees. Worker's compensation insurance. General liability insurance.

How do I get a Utah contractor license? Complete a State approved 25-hour pre-licensure education program. Pass the Business Law Exam and Trade Exam for the type of license you are seeking. Once you've passed the exam, send your passing score, license application, and work experience documentation to the State of Utah.

Repairs Not Requiring Permits Building a deck or platform that is less than 30 inches above the adjoining ground. Building a detached accessory structure that is 200 square feet or less in floor area and only one story in height. Driveways and patios without roof coverings are exempt from permit requirements.

A Building Permit is required before you , construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any building or structure in Grand County.

You can submit your application to the building department in person or electronically, following the instructions provided in the submittal requirements. Review: The County undertakes a review process of the submitted permit application and supporting documents.

You are allowed to build only one (1) house in a calendar year. You are limited to build only three (3) houses in five years. You must actually live in the house for 'a reasonable amount of time'

Utah is unique in that it has no central state building department. Instead, each city or county has its own building department as well as specific rules and permitting guidelines. Projects in Salt Lake City require permits issued through the Salt Lake City Building Department.

The $250-million North Capitol Building will include the Museum of Utah, a public showcase of the state's history, space for the permanent and safe storage of the state's collection of historic artifacts, office and meeting space, two new public plazas and the replacement of an underground parking garage.

The Largest General Contractors in Every U.S. State State ↓Contractor nameRevenue Utah Big-D Construction $2.469B Vermont Engelberth Construction $150M Virginia Bechtel $11.99B Washington Goodfellow Bros. $790M46 more rows

The Utah Building Code 2021 is based on the International Building Code 2021 (IBC 2021) with amendments and additions.

Trusted and secure by over 3 million people of the world’s leading companies

Construction Site In Building In Utah