Best for large or uncertain projects: GMP contracts are generally suited for large-scale or uncertain projects, as they balance budget control and adaptability. This flexibility level may be unnecessary for smaller, clearly defined projects.
The major difference between lump sum and EPC is that, in EPC the contractor has the responsibility of design and construction. b. Where as in lump sum contract the design and drawings are prepared by the technical team of the owner.