Jct Standard Building Contract Without Quantities In Riverside

State:
Multi-State
County:
Riverside
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The JCT Standard Building Contract Without Quantities in Riverside serves as a comprehensive agreement between a contractor and an owner for construction projects where detailed quantities are not specified. This contract outlines key features such as the scope of work, permitting responsibilities, and insurance requirements, ensuring all parties understand their obligations. It includes sections on soil conditions, changes to scope, and the contractor's fee structure, allowing for flexibility in project adjustments and cost management. For attorneys, this form aids in drafting legally sound agreements that protect clients' interests. Partners can utilize this contract to manage collaborative projects effectively, while owners benefit by having a clear outline of expected responsibilities and deliverables. Associates, paralegals, and legal assistants can leverage this form for drafting, filling, and editing contracts, streamlining the construction process and enhancing communication between involved parties. Overall, the contract is instrumental in maintaining legal and operational clarity in construction dealings.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.

The Standard JCT Contract is drafted to suit larger works, or works of a complex nature that involve a high degree of building services or specialist work and its drafting to include provisions allowing: for the contractor to design discrete parts of the works. works to be carried out in sections.

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

BOQ vs BOM While a bill of quantities (BOQ) includes an itemized list of all project costs — including materials and labor hours — a bill of materials (BOM) only includes materials. Some general contractors include a BOM in the bid packages for subcontractors, on large and small projects alike.

Trusted and secure by over 3 million people of the world’s leading companies

Jct Standard Building Contract Without Quantities In Riverside