This form is a Construction Contract. The form contains the following subjects: scope of work, work site, and insurance. The contractor's warranty is limited to defects in workmanship within the scope of the work performed by the contractor.


What is a Construction contract agreement?


If you’re planning to build, renovate or reconstruct your house, you will need to enter into a contract for home construction with the building contractor, defining your mutual rights and responsibilities. This agreement contains project specifics, the contractor’s license and insurance details, the requested scope of work, etc. It may also determine the potential lien on the property should the work not be paid in full.


Types of construction contracts


Depending on the payment arrangements determined by parties, there are four basic types of home builders’ contracts:


1. Fixed price (or lump-sum) agreements set the price for the completed job right from the start. Although fixed, the document may also include provisions defining penalties (for example, if the constructor fails to finish the work on schedule).


2. Cost plus construction agreements set the price for the finished work based on building materials and labor with additionally mentioned “plus” (a percentage of the total costs or a fixed fee).


3. Time and material agreements set the price for the work without a “plus,” but the client pays the contractor a daily or hourly rate while they are under contract.


4. Unit-price agreements are standard in bidding, particularly for federal building projects. Both owner and contractor define the price that the contractor charges for a standard unit without any specific extra fees for other units.


The first two types of contract for home construction mentioned are the most popular ones. Let’s take a closer look at them.


Fixed price vs. cost-plus contract benefits


The fixed price agreement benefits owners more than builders, as it determines at the moment the parties seal the deal the exact price the contractor will get after they complete all the work. Builders risk not getting the estimated profits they initially anticipated, as expenses may increase significantly but remain the constructor’s responsibility.


The cost-plus construction deal contains the evaluation of the final project cost; however, it doesn’t determine the final contract price until the contractor completes all the work. Unlike the fixed-price agreement, it separates expenses and sets the profit rate (as a percentage of the final project cost or as a flat amount), so contractors prefer this type of agreement; it is riskier for homeowners.


Information you should provide in the construction contract agreement


The presented Construction Contract for Home is a universal multi-state construction contract template. This sample describes typical terms for a home building contract. Download a printable document version from our website or amend and fill it out online. Make sure to provide the following information:


• Name and contact details of the contractor and their license number;


• Name and contact details of the homeowner;


• Property legal description from county clerk’s records;


• Project description with blueprints and building specifications;


• Scope, description of work, and its estimated final dates;


• Costs of work and responsibilities of parties for any breach of contract.

Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Most construction in New York City requires approval and permits from the Department of Buildings. Some minor alterations may be done without a work permit.

What do I need? Be at least 18 years old. Be a New York City resident. Be authorized to work in the United States. Have a High School Diploma or equivalency (GED/HSED) Have eighth-grade reading and math comprehension or above. Be interested in a career in the construction trades.

On average, it takes about 1-3 months to get a building permit in NYC. Permitting timelines depend on the type of permit you applied for. Current timelines for the DOB to review an initial permit application are: Alt1 (standard filing): 3-4 months.

Call 311 or 212-NEW-YORK (212-639-9675) to report the problem. You can report damaged, inadequate, loose, or missing safety netting at a construction site.

PROJECTS WHICH REQUIRE A BUILDING PERMIT: New buildings, additions, and reconstruction projects. Press boxes, concession stands, toilet facilities, permanent greenhouses, storage/utility buildings, dugouts which include a storage room, guard booths, and similar structures.

A person or business must have a Home Improvement Contractor License if engaged in the construction, repair, remodeling, or addition to any land or building used as a residence.

If work has been performed without a permit and an applicant seeks a permit for the unpermitted work before a notice of violation is issued, the penalty for such unpermitted work is $600 when performed on a one-family or two-family dwelling or $6,000 when performed on a building other than a one-family or two-family ...

Construction Project Planning Steps Meet with Stakeholders to Gather Requirements. Conduct a Feasibility Study. Perform a Site Analysis. Define the Project Scope with a Work Breakdown Structure. Conduct a Material Takeoff. Make a Bill of Quantities. Request Vendor Quotes. Estimate Costs of Materials and Labor.

Here's the process: Step 1: Design. The design phase is a critical stage in any construction project, laying the foundation for the entire build. Step 2: Pre-Construction. Step 3: Procurement. Step 4: Construction. Step 5: Commissioning. Step 6: Owner Occupancy. Step 7: Project Closeout.

More info

This section explains the various aspects of the project process, from obtaining permits and inspections to final inspection and sign-off. This stepbystep guide will walk you through the process, from defining your goals to completing your project on time and within budget.Before a construction project is ultimately complete it must be "closed-out. " Essentially the process includes three components. Construction in the Bronx must follow strict building codes and zoning laws. Before starting, check what permits you need for your project. Instructions to Applicant. A building permit is required for the construction, renovation, alteration, repair, relocation, demolition, use, and occupancy. Most construction projects in New York City require a building permit. Learn how to apply for and obtain a building permit from the DOB.