So the information here is what is happening now. You can always check with your local permit office for current approval times. For a typical project in Fairfax County (public utilities, no RPA or Flood Zone, no full geotech report required, etc), you can expect your permit to be approved in 4 – 8 weeks.
Permits are typically required for the following projects: alterations to existing commercial structures; commercial structures; carport enclosures; decks; demolition; electrical systems; finished basements; garages and sheds; HVAC systems; mobile homes; plumbing systems; pools, spas and hot tubs; renovations; ...
A building permit is required for all new residential, commercial, and industrial construction – including alterations and equipment installations in Fairfax County.
A permit remains valid for as long as the work is proceeding, and an inspection is performed within the last 6 months. If the work is halted or abandoned for a period of at least 6 months, the permit may be suspended. Extensions may be granted by the Building Commissioner.
A height certification verifies compliance with the building height requirement of the zoning district in which the dwelling is located and the approved site-related plans. The height certification must be approved for certain residential projects before a Residential Use Permit can be issued.
Compliance with a notice of violation notwithstanding, the building official may request legal proceedings be instituted for prosecution when a person, firm or corporation is served with three or more notices of violation within one calendar year for failure to obtain a required construction permit prior to ...
Permits are required for the construction of a new building, shed, deck, additions, or renovations to existing structures.
Structures over 256 square feet in size require a building permit. Also, most plumbing or electrical lines that are run to a structure require trade permits.