Setback Requirements: Main Structure. 25 ft. The sum of the side yard setbacks shall be at least 25% of the lot width, but not to exceed 50 ft.
110.15 Building Safety Inspection Program. BORA by written policy shall establish the guidelines and criteria which will be the minimum requirements for the Building Safety Inspection Program. The Building Official shall enforce the building safety inspection Program.
When an owner requests a Change of Contractor, the owner shall submit a notarized letter to the Building Official of the Building Code Services Division, stating the reason for the change being required and stating that the Building Official is held harmless from any legal involvement regarding this request.
Single-family home and inium replacement of existing countertops and sinks that are going back in the same location (bathroom vanity, kitchen cabinetry replacement in single family and iniums does require a permit) Window repair.
In ance with the Current edition of The Florida Building Code, the following items are exempt from permitting: Floor coverings such as tile or carpet. Minor cabinetry which does not include any electrical or plumbing fixtures. Minor drywall repairs. Painting. Portable Heating or cooling appliances.
Minor Construction or Maintenance Work: Work such as installation of water meters (up to two (2) inches) at existing service laterals, cable splice pits not in or within two (2) feet of a roadway, street light or traffic signal maintenance, or similar types of work may be done without permit or prior notice to the ...
In the unincorporated areas of Broward County and in cities we contract with, a permit is required to construct, enlarge, alter, repair, move, remove or demolish any building, structure or part thereof.
A qualifier is an entity that represents the work of a business. In the construction industry, this simply means a licensed contractor that can perform work in a state under the “umbrella” of your business. This is necessary because only individuals – not companies - can acquire a contractor's license.
The Florida Building Code requires a Building Permit to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to , , enlarge, alter, repair, remove, convert, or replace any impact-resistant coverings, electrical, gas, mechanical or plumbing system, the ...