It provides a safety net for unexpected expenses and ensures the project stays on track, both in terms of budget and timeline. The recommended percentage for a contingency fund is between 5-10% of the total budget, but this may vary depending on project complexity and past experiences.
The average contingency rate falls between 20-40%, with most lawyers charging around 33% to 35% of the total amount recovered in a case. The exact percentage can vary depending on the complexity of the case, the lawyer's experience, and the stage at which the case is resolved.
Project contingency is simply the process by which you account for uncertainty in that estimation by factoring in any risk. This is then added to the original estimate to ensure the company is prepped for a worst-case scenario that could otherwise derail a project.
A contingency can cover a range of unexpected costs during a construction project. Some examples are unforeseen site conditions, changes in project scope, unplanned repairs, delays in timeline and regulation changes such as building codes or zoning requirements.
When determining a contingency for the contractor, the owner should consider the project's level of risk. A range of 5 to 10 percent is common, based on the level of risk, difficulty, and complexity the contractor will face.
How Is Construction Contingency Calculated? Typically, most construction projects use a contingency rate of 5% to 10% from the total project budget. This is typically enough to cover any unexpected costs that may arise throughout the project.