Sidewalks and driveways not more than 30 inches above adjacent grade, and not over any basement or story below grade and not part of an accessible route. Movable cases, counters and partitions that are not over 5 feet 9 inches in height.
A UCC Building Permit is required if you intend to construct, enlarge, convert, move, demolish or change the occupancy of any residential building (1-2 family dwelling) or accessory structure regulated by the Uniform Construction Code. UCC Building Permits are required for: ALL new construction.
Per the California Residential Code detached accessory structure not exceeding 120 square feet does not require a building permit if there is no plumbing, electrical, and or mechanical equipment. Please note, Sheds and/or Structures under 120 square feet do require a Planning Permit.
(a) An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a commercial building, structure and facility or to , , enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical, or plumbing system regulated by the Uniform ...
Sheds under 200 square feet require a $25 Zoning Permit Application. Sheds measuring 200 square feet or larger necessitate a Residential Building Permit Application.
Any deck - freestanding or attached to a structure - with a floor height 30” or more above finished grade (measured at any point within 36" of the outside perimeter of the deck) requires a building permit from the Code Office.
Although most construction projects require a building permit, the Pennsylvania Uniform Construction Code (PA UCC) under Sections 403.1, 403.42, and 403.62 provide a number of specific exemptions. Keep in mind: many provisions of the PA UCC are amendable by the local jurisdiction.
Pennsylvania became the first state to adopt the UCC in 1953, and every other state followed suit over the next twenty years.