What Should a Construction Change Order Form Include?The name and address of the project.The owner's name.The name and phone number of the person requesting the change.A complete description of the planned work.The price of the change (including a breakdown of the costs as well as the total)More items...?
The Top Three Ways to Improve Change Orders Negotiations#1 Understand the Origin of the Change Order. Before picking up the phone to negotiate, it's best to prepare.#2 Reference the Prime Contract. Next, look back at the prime contract.#3 Leverage Industry Experience.
Classic examples of change orders include the owner's desire to move the location of a wall to accommodate some other design element, adding a window where there was none in the original plans, or changing the finish of the floors from tile to terrazzo.
In fact, the term change order is found 23 times in the text of the AIA's A2012122 General Conditions of the Contract for Construction (2017) and is defined therein as A written instrument prepared by the Architect and signed by the Owner, Contractor, and Architect stating their agreement upon all of the following: 1)
A standard change order should include the following:Job name, address and phone number.Owner's name.A complete description of new work to be performed.Total price for materials and labor to complete the change.Revised date of completion due to the change order.Signatures of the company representative.More items...?