Jct Standard Building Contract Without Quantities In San Jose

State:
Multi-State
City:
San Jose
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Jct standard building contract without quantities in San Jose is a construction agreement designed to outline the relationship between a contractor and an owner for a residential building project. This form specifies the scope of work, including labor and materials required for construction, as detailed in the associated plans and specifications. It establishes the work site and outlines the responsibilities concerning permits and regulatory approvals necessary for project execution. Additionally, it addresses issues related to soil conditions, ensuring that the contractor is not liable for soil-related damages. Insurance requirements are clearly stated, and the contract provides for adjustments to the scope of work through written change orders, along with associated costs. Payment structures are defined, allowing for either cost-plus or fixed fee arrangements, and it includes terms regarding late payments and warranty provisions. This contract is particularly useful for attorneys, partners, owners, associates, paralegals, and legal assistants involved in construction projects, as it provides a clear and structured method for formalizing agreements while protecting the rights and obligations of each party.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.

Below, we'll go into more detail about each one-line aspect that could mean that your organization's contract process isn't working properly: No central storage location/no contract reporting. Friction between teams. Overloaded legal department. Long and opaque contract cycles. Lack of overview and missed contract deadlines.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

A more important problem with the theory is that it is easy to exclude the poor, the dispossessed, the homeless, and the uneducated. These members of a society may not know the rules intended to govern member's behavior and do not benefit from the social contract.

Saves time: by streamlining and simplifying the process. Comprehensive: JCT contracts are thorough documents, covering most potential issues and reducing the risk for the employer should their contractor's quality of work be inadequate or not delivered to the agreed time.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

JCT contracts don't specify remedies for common issues. They rely on existing case law precedents to find a resolution. This can be complex and time-consuming, and seriously impact project timelines.

Clause 4.7. 2 4.7. 2 The sum due as an Interim Payment shall be an amount equal to the Gross Valuation under clause 4.13 where Alternative A applies, or clause 4.14 where Alternative B applies, in either case less the aggregate of: 4.7.