The Jct standard building contract without quantities in Pima is a comprehensive legal document designed to outline the agreement between a Contractor and an Owner for the construction of a residence. Key features of this contract include the scope of work, detailed project descriptions, and the work site location. It specifies responsibilities regarding permits, soil conditions, insurance requirements, and necessary surveys. The contract allows for changes in the scope of work through a written 'Change Order' process, ensuring the Owner covers any additional costs incurred. Payment terms include both cost-plus and fixed-fee options, along with clauses addressing late payments and warranties. This form is particularly beneficial for attorneys, partners, and owners who need clear contractual guidelines for residential construction projects. Associates, paralegals, and legal assistants will find it useful for drafting, reviewing, and ensuring compliance with legal standards, fostering smooth project execution and reducing the risk of disputes.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

BOQ vs BOM While a bill of quantities (BOQ) includes an itemized list of all project costs — including materials and labor hours — a bill of materials (BOM) only includes materials. Some general contractors include a BOM in the bid packages for subcontractors, on large and small projects alike.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

So, if you ever come across someone referring to a 'JCT contract', it is typically about a standard building contract. These contracts are usually between an 'employer' and a 'contractor' to facilitate a building works project. They set out all of the relevant terms and conditions, including: Obligations of the parties.

Clause 4.7. 2 4.7. 2 The sum due as an Interim Payment shall be an amount equal to the Gross Valuation under clause 4.13 where Alternative A applies, or clause 4.14 where Alternative B applies, in either case less the aggregate of: 4.7.