Building Contract For Renovations In Maricopa

State:
Multi-State
County:
Maricopa
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

This form is a Construction Contract. The form contains the following subjects: scope of work, work site, and insurance. The contractor's warranty is limited to defects in workmanship within the scope of the work performed by the contractor.


What is a Construction contract agreement?


If you’re planning to build, renovate or reconstruct your house, you will need to enter into a contract for home construction with the building contractor, defining your mutual rights and responsibilities. This agreement contains project specifics, the contractor’s license and insurance details, the requested scope of work, etc. It may also determine the potential lien on the property should the work not be paid in full.


Types of construction contracts


Depending on the payment arrangements determined by parties, there are four basic types of home builders’ contracts:


1. Fixed price (or lump-sum) agreements set the price for the completed job right from the start. Although fixed, the document may also include provisions defining penalties (for example, if the constructor fails to finish the work on schedule).


2. Cost plus construction agreements set the price for the finished work based on building materials and labor with additionally mentioned “plus” (a percentage of the total costs or a fixed fee).


3. Time and material agreements set the price for the work without a “plus,” but the client pays the contractor a daily or hourly rate while they are under contract.


4. Unit-price agreements are standard in bidding, particularly for federal building projects. Both owner and contractor define the price that the contractor charges for a standard unit without any specific extra fees for other units.


The first two types of contract for home construction mentioned are the most popular ones. Let’s take a closer look at them.


Fixed price vs. cost-plus contract benefits


The fixed price agreement benefits owners more than builders, as it determines at the moment the parties seal the deal the exact price the contractor will get after they complete all the work. Builders risk not getting the estimated profits they initially anticipated, as expenses may increase significantly but remain the constructor’s responsibility.


The cost-plus construction deal contains the evaluation of the final project cost; however, it doesn’t determine the final contract price until the contractor completes all the work. Unlike the fixed-price agreement, it separates expenses and sets the profit rate (as a percentage of the final project cost or as a flat amount), so contractors prefer this type of agreement; it is riskier for homeowners.


Information you should provide in the construction contract agreement


The presented Construction Contract for Home is a universal multi-state construction contract template. This sample describes typical terms for a home building contract. Download a printable document version from our website or amend and fill it out online. Make sure to provide the following information:


• Name and contact details of the contractor and their license number;


• Name and contact details of the homeowner;


• Property legal description from county clerk’s records;


• Project description with blueprints and building specifications;


• Scope, description of work, and its estimated final dates;


• Costs of work and responsibilities of parties for any breach of contract.

Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Electronic submittals are completed online. Applications and information regarding the submittal of building permits can be obtained from the Permitting Services page. For questions regarding Building Permits submittals, call 602-506-3301.

In the Grand Canyon State, a general contractor's license is not just a formality; it's a legal requirement for anyone who intends to build, alter, repair, add to, subtract from, improve, move, wreck, or demolish any structure.

The teen must be at least 15 years and 6 months old. The teen must pass written and vision tests and bring to an office a completed application and all original supporting documents. Note: The permit test may be taken at home with parental or guardian supervision.

A building permit is required if you are altering a space. Alterations include relocation, repair or demolition of structural and non-structural walls, changes to mechanical, plumbing, gas or any electrical work. Depending on the scope of work, licensed professionals may be required to prepare your building plans.

In general, a building permit is required when any structural change or major alteration is made to a building or when any new construction is undertaken.

Building: Sidewalks and driveways not more than 30 inches. Painting, papering, tiling, carpeting, cabinets, counter. Temporary motion picture, television, and theater. Shade cloth structures constructed for nursery or agricultural. Window awnings supported by an exterior wall of.

(B) Electrical However, permits are required to , upgrade or change outlets for decorative purposes. If a GFCI protected outlet is required by code, a permit is required.

The quick and simple answer is: you usually don't need a permit if the shed is 120 square feet or less.

Trusted and secure by over 3 million people of the world’s leading companies

Building Contract For Renovations In Maricopa