Description

The Jct standard building contract with quantities in Illinois is a comprehensive document designed to facilitate construction projects by outlining the roles and responsibilities of both the Contractor and the Owner. This contract includes sections detailing the scope of work, work site description, necessary permits, and insurance requirements, ensuring all legal bases are covered for both parties. The document emphasizes the need for written change orders to modify the scope of work and outlines the billing structure, which can be based on cost plus or fixed fee arrangements. It also addresses late payments and warranties for workmanship, providing clarity on obligations and rights. For attorneys, partners, and paralegals, this form serves as a reliable foundation for legal construction agreements, while owners and associates can utilize it to safeguard their interests and ensure project accountability. Legal assistants will find this form straightforward for drafting and managing contracts, promoting effective communication between all parties involved. Additionally, this contract is especially useful in Illinois for clarifying the expectations and legal frameworks necessary for successful construction endeavors.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The JCT Measured Term Contract is designed for use by employers who have a regular flow of maintenance, minor works and improvements projects that they would like to be carried out by a single contractor over a specified period of time.

The Standard JCT Contract is drafted to suit larger works, or works of a complex nature that involve a high degree of building services or specialist work and its drafting to include provisions allowing: for the contractor to design discrete parts of the works. works to be carried out in sections.

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

The New Engineering Contract (NEC) is a series of contracts designed to manage any project from start to finish. The contracts are written in plain English with a straightforward structure and are designed to be easily understood. NEC contracts aim to prevent costly disputes.

Usually a JCT contract is made between an 'employer' (the client) and the 'contractor' (the construction team) to make the process as seamless as possible. It's a document containing the obligations of everyone involved, the agreed costs and timelines, terms and conditions, and the specifications of the project.

JCT contracts offer a comprehensive structure for construction projects, but they are not without their limitations. Recognising the disadvantages of JCT contracts—such as limited flexibility, complex language, and potentially high costs—can help clients and contractors approach these agreements with greater awareness.

Generally, NEC contracts are aimed at engineering projects but are easily adapted to building works. JCT contracts are aimed at building works rather than engineering projects but again can be adapted for both.

At a greater level of detail, JCT provides a number of subjective tests for determining if certain events give grounds for recompense to the contractor, whereas NEC generally relies on more objective tests.