You need a building permit before beginning most types of building construction, demolition, rehabilitation, and repair work in Chicago. A building permit is not needed for a limited range of site work, nonstructural repairs, minor alterations, and non-occupied structures.
A building permit is not required for the following types of work: Painting, wallpapering, tiling, carpeting, installing cabinets or countertops, or performing similar finish work, without plumbing or electrical connections.
Ing to general guidelines, easy permits can be obtained the same day through the City. However, it's best to budget around four weeks for the reception of a building permit if you're applying through the easy permit system.
A permit is required before beginning most construction, demolition, and repair work. In order to provide more responsive service, the Department of Buildings offers permitting processes tailored for a wide variety of projects, from home repairs to new skyscrapers.
A City of Chicago general contractor license is required to perform most types of building construction, alteration, repair, and demolition work within the City of Chicago.
A street performer license is required for individuals that perform in a public area. The performance may be, but not limited to acting, singing, playing musical instruments, pantomime, juggling, magic, dancing and reciting.
A permit is generally required before beginning new construction, repairs, additions, alterations or demolition projects.
In the city of Chicago, permits are required for most tuckpointing work, and the work must be performed by a licensed masonry contractor.
Easy building permits are required for all projects that involve any structural changes or removals/repositioning of any electrical, plumbing, or mechanical systems. If the project is simple and does not require drawings, you can follow the easy permit process in Chicago to obtain a permit.