When an owner requests a Change of Contractor, the owner shall submit a letter to the Building Official of the Building Code Services Division (BCSD), stating the reason for the change being required and stating that the Building Official is held harmless from any legal involvement regarding this request.
The Florida Building Code requires a Building Permit to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to , , enlarge, alter, repair, remove, convert or replace any impact resistant coverings, electrical, gas, mechanical or plumbing system, the ...
Setback Requirements: Main Structure. 25 ft. The sum of the side yard setbacks shall be at least 25% of the lot width, but not to exceed 50 ft.
In ance with the Current edition of The Florida Building Code, the following items are exempt from permitting: Floor coverings such as tile or carpet. Minor cabinetry which does not include any electrical or plumbing fixtures. Minor drywall repairs. Painting. Portable Heating or cooling appliances.
A permit is required for a wide variety of construction, remodeling and repair work, including residential permits, commercial permits, Manufacturing plants, and accessory installations.
Per the Florida Building Code, sheds 200 square feet or less and used exclusively for storage purposes are exempt from permitting requirements.
Minor Construction or Maintenance Work: Work such as installation of water meters (up to two (2) inches) at existing service laterals, cable splice pits not in or within two (2) feet of a roadway, street light or traffic signal maintenance, or similar types of work may be done without permit or prior notice to the ...
Fort Lauderdale boasts stunning beaches, vibrant nightlife, cultural attractions like the Bonnet House Museum & Gardens, and various water activities, making it a top destination for tourists worldwide.
Until the plant comes back online, the entire city is getting its water from Fiveash, Fort Lauderdale's main water treatment plant. Fiveash, which produces water with a yellow tint, relies on a lime-softening treatment system that's not able to remove tannins from the underground water supply.