A Building Permit is required before you , construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any building or structure in Grand County.
The permit must be taken out by the person doing the work, the electrical contractor or the homeowner. State law does allow a homeowner of a single family residence to do his or her electrical work.
In fact, even in recent years, despite higher interest rates, the Salt Lake City real estate market has remained relatively stable, with stagnant or slightly increasing median home prices. Looking ahead to 2025, appreciation is expected to continue, making it more likely that home values will rise.
Do I need a permit to build a shed? A building permit is required for a shed that is larger than 200 square feet. Please contact 801-446-4357 (HELP) prior to construction.
Repairs Not Requiring Permits Building a deck or platform that is less than 30 inches above the adjoining ground. Building a detached accessory structure that is 200 square feet or less in floor area and only one story in height. Driveways and patios without roof coverings are exempt from permit requirements.
If anything has been built that does not comply with zoning ordinances or building codes, city officials can order that portion of the work to be demolished. In addition, a fine can be levied on the project. Therefore, most professional contractors will not proceed on a project without a permit.
Replacement Requirements A permit is required to replace a roof, furnace or water heater.
Scheduling an inspection made easy Schedule building inspections using the Citizens Access Portal here. You can also schedule inspections using our automated system by calling 801-535-6000 and following the automated prompts. Here you will find printable instructions and 3 digit inspection codes.
Features. The Salt Lake City and County Building's central clock tower is topped with a statue of Columbia and rises 256 feet (78 m) from the ground.
Building Services | (801) 535-6000.