Accessory structures greater than 120 square feet for residential structures and 200 square feet for commercial structures shall require zoning administrator approval.
Why do I need a Permit? Residential Work – Decks, garages, ALL type of fences, culverts, water heaters, fireplaces, pools & pool barriers, patio enclosure, etc.
Call 602-506-7170 for assigned inspector information; if unavailable, contact the Call Center at 602-506-3301 for immediate assistance.
Building Permits are issued and finaled with inspections as applicable. A Certificate of Occupancy will be issued upon receiving a final permit. The applicant must obtain a license from the State of Arizona prior to operation of the community residence.
Note 1: The City of Phoenix maximum occupancy standards allow two persons per sleeping room. Occupancy exceptions will be considered if a family has special circumstances that are justified in writing. Exceptions will not exceed HUD's Housing Quality Standards (HQS) which allow two persons per living/sleeping room.
Building: Sidewalks and driveways not more than 30 inches. Painting, papering, tiling, carpeting, cabinets, counter. Temporary motion picture, television, and theater. Shade cloth structures constructed for nursery or agricultural. Window awnings supported by an exterior wall of.
The quick and simple answer is: you usually don't need a permit if the shed is 120 square feet or less.
In general, a building permit is required when any structural change or major alteration is made to a building or when any new construction is undertaken.
(B) Electrical However, permits are required to , upgrade or change outlets for decorative purposes. If a GFCI protected outlet is required by code, a permit is required.