Boundary Lines For Project In San Jose

State:
Multi-State
City:
San Jose
Control #:
US-00440
Format:
Word; 
Rich Text
Instant download

Description

This Boundary Line Agreement is used for parties who have disputed over the boundaries of a piece of real estate. The parties agree that by execution of this Agreement, they are quitclaiming their respective interests to the appropriate party on the other side of the dividing line. A surveyor's drawing of the disputed land and relative tracts of all parties should be attached for clarification.
Free preview
  • Form preview
  • Form preview
  • Form preview
  • Form preview

Form popularity

FAQ

13.01 Land Use Definition Medium density residential (R1-8): the principal land use is a single-family dwelling, including cluster housing. No residence in this category shall have livable floor area of less than one thousand five hundred square feet.

There are five easy ways to file a complaint: Online Complaint Form. Phone: (408) 794-6226. Email: ipa@sanjoseca. Mail: 96 N. Third St., Suite 150, San Jose, CA. In-Person: 96 N. Third St., Suite 150, San Jose, CA.

Filing a Claim The City of Oakland has a standard claim form that can be used for your convenience. You can file the form electronically at claims@oaklandcityattorney, or you can send the form by mail to: Oakland City Attorney's Office, 1 Frank H. Ogawa Plaza, 6th Floor, Oakland, CA 94612.

There are five easy ways to file a complaint: Online Complaint Form. Phone: (408) 794-6226. Email: ipa@sanjoseca. Mail: 96 N. Third St., Suite 150, San Jose, CA. In-Person: 96 N. Third St., Suite 150, San Jose, CA.

ADUs must be equipped with permanent facilities for independent living, but JADUs need only have an “efficiency” kitchen and may share some facilities with the primary dwelling. The maximum size allowed for a JADU is 500 sq. ft., while two-bedroom ADUs in San Jose may be up to 1,000 sq. ft.

She is a native of San José and currently lives in the City with her family. Dolan Beckel is the Chief of Staff for the City Manager, Jennifer Maguire.

To schedule an inspection Self-schedule an inspection at .sjpermits -- it's easy -- just click the "Schedule an Inspection" button. For assistance with scheduling an inspection, call 408-535-3555 during normal business hours.

Maximum allowable fence height without a permit Side yard along the street - 3 feet maximum. Rear and side yards that are not long the street - 7 feet maximum. Sightlines to the street from any driveway - Side and rear fence heights must be low enough to provide sightlines to the street from the driveway.

In California, any pool regardless of its size or shape built or remodeled after 2007 requires a pool fence. This includes spas and portable, in-ground or inflatable pools that contain over 18 inches of water.

If you need to get in touch with the City and don't know who to call, dial the Contact Center at (408) 535-3500 and our friendly staff will be glad to assist you! You can also contact us by fax at (408) 292-6731 or by email. To better assist you online, visit our City Services A-Z and Online Services.

More info

Below are the forms, fees, and appointment process to apply for a Planning permit or related process. The land survey is the base for all design.You need a quality survey and we deliver the most detailed and complete surveys in the industry. The County Surveyor's Office also prepares, reviews, and approves district boundaries for the Local Agency Formation Commission (LAFCO). Read this guide to San Jose building permits to learn what the city requires and how to navigate the application process. San Jose's residential zoning laws help manage the city's development and land use. These regulations ensure that development aligns with the city's goals. Any subdivider may file a tentative map of a proposed subdivision in a territory adjacent to such city prior to annexation. San Jose Unified School District; Union Elementary School District. Learn how to use one table to build up a 658000sqft campus in 3 months.

Trusted and secure by over 3 million people of the world’s leading companies

Boundary Lines For Project In San Jose