For most projects, fill out the Basic Application for Development Review and other needed forms. Prepare required plans and materials.TO BE COMPLETED BY CITY STAFF:​​ Note to Case Planner: Please route a copy of this form to the green building coordinator in the Planning and Zoning Division. Tilt-Up construction combines the strength and durability of reinforced concrete with the precision and efficiency of the Design-Build methodology.