The procedure is even more straightforward for existing members of the US Legal Forms library. If your subscription is active, simply Log In to your account and click the Download button next to the chosen document. Additionally, you can access the Easement For Electric Lines at any time, as all forms previously obtained on the platform remain accessible within the My documents section of your profile. Conserve time and money when preparing official documents. Experience US Legal Forms today!
Utility easements shall be at least ten (10) feet wide, five (5) feet on each side of the lot line and shall be located along the rear or front lines as needed for proper utility placement. When necessary, side utility easements shall be at intervals of no more than three hundred (300) feet along a block face.
Lots with minimal vegetation along lot lines and relatively even terrain should have a utility easement of a 8-foot-wide strip along each side of each lot and a 15-foot-wide strip along rear of each lot.
Landowners retain the right of use to the land through these agreements, as long it doesn't interfere with the utility company's immediate access.
A typical water or sewer easement is 20 feet in width but may be 30 feet or wider depending upon the diameter of the water or sewer main and the depth of the main.
A right of way is adequate for access and road construction on Crown land. An easement is required if utility services are to be installed in addition to a roadway.