The Jct standard building contract without quantities in Suffolk is a formal agreement between a contractor and an owner, outlining the terms for constructing a residential project. Key features include the defined scope of work, specifying project details and site location, and the requirement for the contractor to secure necessary permits. The document clarifies that the contractor is not liable for soil conditions at the work site, shifting that responsibility to the owner for any required additional site work. It includes clauses for insurance obligations, the importance of providing a boundary survey and title opinion prior to construction, and a structured process for making changes to the scope of work through written change orders. The contractor’s fees can be based on a cost-plus or fixed-fee arrangement, detailing payment schedules and late payment penalties. Additionally, the contractor offers a limited warranty for workmanship defects, covering claims made within one year after project completion. This contract serves as a vital tool for attorneys, partners, owners, associates, paralegals, and legal assistants involved in construction projects, providing clear guidelines for project execution and risk management.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.