Jct Standard Building Contract Without Quantities In San Diego

State:
Multi-State
County:
San Diego
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Jct standard building contract without quantities in San Diego serves as a formal agreement between a contractor and an owner for residential construction projects. It outlines the scope of work, specifying the labor and materials needed, and establishes the work site for the project. Key features include the contractor's responsibility for obtaining necessary permits, insurance requirements, and stipulations related to soil conditions and boundary surveys. The form allows for changes to the scope of work through written change orders, ensuring that any cost implications are addressed. Payment options are flexible, offering both cost-plus and fixed-fee structures, and late payment penalties are clearly defined. The contract includes a warranty section that limits the contractor's liability to defects in workmanship for one year. This form is particularly useful for attorneys, partners, and owners in construction, as it provides a clear legal framework for the project, ensuring transparency and protection for both parties involved. Paralegals and legal assistants will find it essential for accurate documentation and contract management, supporting their roles in ensuring compliance and facilitating communication.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Lesson Summary. A contract is a legal agreement between two or more parties in which they agree to each other's rights and responsibilities. Offer, acceptance, awareness, consideration, and capacity are the five elements of an enforceable contract.

To be legally enforceable, an agreement must contain all of the following criteria: An offer and acceptance; Certainty of terms; Consideration; An intention to create legal relations; Capacity of the parties; and, Legality of purpose.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

A legally enforceable contract must include an offer, acceptance, consideration, capacity, legality, and mutual assent.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

The Standard JCT Contract is drafted to suit larger works, or works of a complex nature that involve a high degree of building services or specialist work and its drafting to include provisions allowing: for the contractor to design discrete parts of the works. works to be carried out in sections.

JCT contracts don't specify remedies for common issues. They rely on existing case law precedents to find a resolution. This can be complex and time-consuming, and seriously impact project timelines.

Trusted and secure by over 3 million people of the world’s leading companies

Jct Standard Building Contract Without Quantities In San Diego