Cost Plus Construction Contract With Guaranteed Maximum Price In Pima

State:
Multi-State
County:
Pima
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Cost Plus Construction Contract with Guaranteed Maximum Price in Pima outlines the agreement between the contractor and owner for constructing a residential project. Key features include the scope of work, work site authorization, and responsibility for permits and soil conditions. This contract allows for changes to the work scope through written change orders, with costs to be covered by the owner. The contractor's fee structure can be based on actual costs plus a specified amount or a fixed fee. Payment terms include provisions for late fees and the contractor's warranty limited to one year for workmanship defects. The form is beneficial for attorneys, partners, owners, associates, paralegals, and legal assistants by providing a clear framework for managing construction projects and ensuring compliance with local regulations while minimizing disputes related to costs and responsibilities.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The GMP Budget is the amount the Trustees have budgeted for the construction Contract. The award of a construction contract is contingent upon receiving an actual GMP within the GMP Budget.

Maximum Allowable Construction Area (MACA) “ the combined total of the Maximum Allowable PSO and the Maximum Allowable ISA. Maximum Allowable Unpaved Surface Area (USA) “ portion of the lot that shall remain unpaved and reserved for softscaping/planting.

Intelligent Transportation System (ITS) Construction Engineering Inspection is vital to the success of modern infrastructure projects. As technology continually improves, we find ways to incorporate computer systems into roadways, keeping drivers safer and more informed.

max, or impact testing, is a measurement of the shockattenuation of the playing surface. The test results for gmax are exhibited as a ratio of the acceleration/deceleration that happens during impact to the normal acceleration rate which comes as a result of gravity.

Trusted and secure by over 3 million people of the world’s leading companies

Cost Plus Construction Contract With Guaranteed Maximum Price In Pima