Construction Project In Building In Philadelphia

State:
Multi-State
County:
Philadelphia
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

This form is a Construction Contract. The form contains the following subjects: scope of work, work site, and insurance. The contractor's warranty is limited to defects in workmanship within the scope of the work performed by the contractor.


What is a Construction contract agreement?


If you’re planning to build, renovate or reconstruct your house, you will need to enter into a contract for home construction with the building contractor, defining your mutual rights and responsibilities. This agreement contains project specifics, the contractor’s license and insurance details, the requested scope of work, etc. It may also determine the potential lien on the property should the work not be paid in full.


Types of construction contracts


Depending on the payment arrangements determined by parties, there are four basic types of home builders’ contracts:


1. Fixed price (or lump-sum) agreements set the price for the completed job right from the start. Although fixed, the document may also include provisions defining penalties (for example, if the constructor fails to finish the work on schedule).


2. Cost plus construction agreements set the price for the finished work based on building materials and labor with additionally mentioned “plus” (a percentage of the total costs or a fixed fee).


3. Time and material agreements set the price for the work without a “plus,” but the client pays the contractor a daily or hourly rate while they are under contract.


4. Unit-price agreements are standard in bidding, particularly for federal building projects. Both owner and contractor define the price that the contractor charges for a standard unit without any specific extra fees for other units.


The first two types of contract for home construction mentioned are the most popular ones. Let’s take a closer look at them.


Fixed price vs. cost-plus contract benefits


The fixed price agreement benefits owners more than builders, as it determines at the moment the parties seal the deal the exact price the contractor will get after they complete all the work. Builders risk not getting the estimated profits they initially anticipated, as expenses may increase significantly but remain the constructor’s responsibility.


The cost-plus construction deal contains the evaluation of the final project cost; however, it doesn’t determine the final contract price until the contractor completes all the work. Unlike the fixed-price agreement, it separates expenses and sets the profit rate (as a percentage of the final project cost or as a flat amount), so contractors prefer this type of agreement; it is riskier for homeowners.


Information you should provide in the construction contract agreement


The presented Construction Contract for Home is a universal multi-state construction contract template. This sample describes typical terms for a home building contract. Download a printable document version from our website or amend and fill it out online. Make sure to provide the following information:


• Name and contact details of the contractor and their license number;


• Name and contact details of the homeowner;


• Property legal description from county clerk’s records;


• Project description with blueprints and building specifications;


• Scope, description of work, and its estimated final dates;


• Costs of work and responsibilities of parties for any breach of contract.

Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Uniform Construction Code Building Permit Overview Inspections are also necessary in several cases, including construction or changes to commercial or residential buildings, electrical, gas, mechanical or plumbing systems, and the installation of swimming pools or hot tubs.

THE FOLLOWING WORK DOES NOT REQUIRE A BUILDING PERMIT: Fully detached accessory buildings to single-family dwellings less than 1,000 square feet. Agricultural Buildings. Manufactured and industrialized housing (mobile homes and modular homes).

Bring your completed application, application materials, and payment to the Permit and License Center. The time it takes to process an application varies by type: Alterations / Additions to a one-or-two-family dwelling: 15 business days. New construction of a one-or-two-family dwelling: 15 business days.

Call 311 to ask for an inspection from the Department of Licenses & Inspections (L&I). File a Fair Housing Complaint. If your unit fails an L&I inspection, you can contact the Fair Housing Commission at 215-686-4670 or go to 601 Walnut St, Suite 300 South to file a complaint. Contact PHA Inspections.

If your landlord refuses to make the repairs you requested, you can call the Department of Licenses and Inspections (often called L&I) at 311. They will come and inspect your apartment or home for repairs.

If work has begun on a project, but there is no permit OR the permit is not posted on the property OR the work that is being done does not match what is on the permit, you can call 311 to report it and request that the property be inspected. You can also submit an online 311 complaint here.

Contact your assigned inspector to arrange the inspections noted on your Administrative Permit. You need to have an inspection for each new Certificate of Occupancy. Inspections are not needed for replacement certificates. A Certificate of Occupancy will be issued upon successful completion of the inspection.

Service overview. You can get an EZ permit for some construction and renovation projects. EZ permits do not require you to submit plans. To find out if your project qualifies, check if the planned work complies with an EZ Standard. If you get an EZ Permit and don't follow the standard, the permit will be revoked.

You need a CO for: New construction. Additions. Alterations that impact exits or fire ratings.

You can apply online or in person in the basement of the Municipal Services building. If you apply online, it will take time for the city to process your application. However, if you apply in person, you can get your Commercial Activity License and Business Income & Receipts Tax account the same day you apply.

More info

You can apply online using eCLIPSE. If you need help filing your application online, you can schedule a virtual appointment.Building permits allow work or a change in activity to be done at a building or on a lot. Read this guide to learn everything you need to know about Philadelphia building permits before starting a construction project in Philly. Compliance with those regulations begins with submitting building plans from a contractor or the building owner. More details can be found on the form below. If you are obtaining the permits yourself, you will have to find and fill out the application for the particular permits your project requires. 1. Identify the location of the property and detail the specific work location. Provide all applicant and property owner details clearly. We're going to talk about what kind you need how much they cost and how long they generally take to get most.