The Construction Contracts Force Majeure in Los Angeles form is designed to outline the agreement between a Contractor and an Owner for a construction project. It specifies the scope of work, work site, necessary permits, and responsibilities regarding soil conditions and insurance. One key feature is the provision for change orders, allowing the Owner to modify the project's scope, provided these changes are documented in writing. The contract includes a detailed fee structure, offering flexibility with options for cost-plus or fixed-fee arrangements. Additionally, it addresses late payments and warranties for workmanship defects, thereby protecting both parties. This form is particularly valuable for attorneys, partners, owners, associates, paralegals, and legal assistants as it provides essential legal protections and clarity in roles and responsibilities. It enables users to navigate potential legal disputes effectively and ensures compliance with local regulations. Completing and editing the form is straightforward, making it accessible for users with varying levels of legal knowledge.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

If a contract is silent on force majeure or if the event does not meet the definition of force majeure under the parties' contract, a party's performance may still be excused in certain circumstances under the doctrine of commercial impracticability.

(1) Neither Party shall be in breach of its obligations under this Agreement (other than payment obligations) or incur any liability to the other Party for any losses or damages of any nature whatsoever incurred or suffered by that other (otherwise than under any express indemnity in this Agreement) if and to the ...

Either Party shall be excused from performance and shall not be in default in respect of any obligation hereunder to the extent that the failure to perform such obligation is due to a Natural Force Majeure Event.

Exhaustive, of examples of force majeure events. Force majeure events generally can be divided into two basic groups: natural events and political events. These may include earthquakes, floods, fire, plague, Acts of God (as defined in the contract or in applicable law) and other natural disasters.

Commonly referred to as “acts of God”, force majeure events are unforeseeable, exceptional or out with the control of contracting parties. Examples include natural disaster, terrorism, industrial strike action, fire and pandemic/epidemic events such as Covid-19.

Templates. “Force Majeure: Neither party shall be liable for any failure or delay in the performance of any obligations under this Agreement, except for the obligation to make payments, if such failure or delay is caused by a Force Majeure event.

Force majeure in any given situation is controlled by the law governing the contract, rather than general concepts of force majeure. Contracts often specify what constitutes force majeure via a clause in the agreement. So, the liability is decided per contract and neither by statute nor principles of general law.

The force majeure clause is a contract provision that relieves involved parties from performing their contract obligations if extreme circumstances or “major unforeseen events” outside of their control arise that would make performing these obligations impossible, inadvisable, or dangerous.

A clearly articulated force majeure clause can protect partnerships by preventing disputes over who is at fault when unpredictable events occur. By addressing risks proactively in the contract, both parties can move forward cooperatively once normal conditions resume.

The major difference in such cases is that, without a force majeure clause, the party that wants to be released from contract obligations has the burden of proof, which means that this party must prove their argument is correct. If the other contracting parties do not agree, this could lead to litigation.