Construction Fee Plus Form For Maintenance Fee In Alameda

State:
Multi-State
County:
Alameda
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

This form is a Construction Contract. The form contains the following subjects: scope of work, work site, and insurance. The contractor's warranty is limited to defects in workmanship within the scope of the work performed by the contractor.


What is a Construction contract agreement?


If you’re planning to build, renovate or reconstruct your house, you will need to enter into a contract for home construction with the building contractor, defining your mutual rights and responsibilities. This agreement contains project specifics, the contractor’s license and insurance details, the requested scope of work, etc. It may also determine the potential lien on the property should the work not be paid in full.


Types of construction contracts


Depending on the payment arrangements determined by parties, there are four basic types of home builders’ contracts:


1. Fixed price (or lump-sum) agreements set the price for the completed job right from the start. Although fixed, the document may also include provisions defining penalties (for example, if the constructor fails to finish the work on schedule).


2. Cost plus construction agreements set the price for the finished work based on building materials and labor with additionally mentioned “plus” (a percentage of the total costs or a fixed fee).


3. Time and material agreements set the price for the work without a “plus,” but the client pays the contractor a daily or hourly rate while they are under contract.


4. Unit-price agreements are standard in bidding, particularly for federal building projects. Both owner and contractor define the price that the contractor charges for a standard unit without any specific extra fees for other units.


The first two types of contract for home construction mentioned are the most popular ones. Let’s take a closer look at them.


Fixed price vs. cost-plus contract benefits


The fixed price agreement benefits owners more than builders, as it determines at the moment the parties seal the deal the exact price the contractor will get after they complete all the work. Builders risk not getting the estimated profits they initially anticipated, as expenses may increase significantly but remain the constructor’s responsibility.


The cost-plus construction deal contains the evaluation of the final project cost; however, it doesn’t determine the final contract price until the contractor completes all the work. Unlike the fixed-price agreement, it separates expenses and sets the profit rate (as a percentage of the final project cost or as a flat amount), so contractors prefer this type of agreement; it is riskier for homeowners.


Information you should provide in the construction contract agreement


The presented Construction Contract for Home is a universal multi-state construction contract template. This sample describes typical terms for a home building contract. Download a printable document version from our website or amend and fill it out online. Make sure to provide the following information:


• Name and contact details of the contractor and their license number;


• Name and contact details of the homeowner;


• Property legal description from county clerk’s records;


• Project description with blueprints and building specifications;


• Scope, description of work, and its estimated final dates;


• Costs of work and responsibilities of parties for any breach of contract.

Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Building - Permitting Process This includes, but is not limited to, additions, remodeling, sheds, decks, pools and any interior remodeling. Permitting is also required for a service upgrade or replacement, window and roof replacement, water heater, furnace and air conditioner replacement.

A Building Permit is required when an accessory building is more than 120 square feet in size (12' Ă— 10' exterior dimensions).

Plumbing, device, heating, cooling, or refrigerating system, water heater, boiler, incinerator, kiln, or other fuel burning appliance. $140.00 for the first device or system, $70.00 for each additional device or system.

Types of Projects That May Be Exempt From a Building Permit in California Painting. Floor upgrades. Kitchen remodels. Small drywall projects. Common electrical work. Small outbuildings. Bathroom fixes. Fences.

Any shed under 10 feet in height from natural ground to highest point may have a side and rear setback of 5 feet. Any shed higher than 10 feet in height needs to follow zone setbacks. Sheds are not allowed in front setback.

Storage sheds that are less than 120 square feet and eight feet in height do not require a building permit, but still require Planning Division approval through an over-the-counter application called a Zoning Clearance.

Maintenance fees typically include: Maintenance and repairs to common property (hallways, elevators, parking area, amenities) Operating and service costs (like utilities, garbage and snow removal, window cleaning, etc.) Insurance. Management costs.

8. Do I need a permit for a storage shed or small building? One-story detached accessory buildings used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 120 square feet, do not require a Building Permit (per California Building Code 105.2 "Work Exempt from Permit").

More info

Planning, Building and Transportation, Fire, and Public Works fees were increased as a result of a fee study conducted on May 21, 2024. AUSD - Contract – Repair, Maintenance or Small Construction – Alameda Unified School District.On a bimonthly basis, the District shall issue to each fire hydrant meter customer a meter read request form. How do I file a complaint? Just fill out this form and submit it to. The County will maintain a comprehensive capital improvements program that is updated each year. The Traffic clerk's offices are open daily Monday through Friday between the hours of am and pm The County will maintain a comprehensive capital improvements program that is updated each year. The Field Maintenance Supervisor is the first-line supervisor responsible for all operations, maintenance and construction in moderate-sized areas. Janitorial Service Fee (When Needed).

Trusted and secure by over 3 million people of the world’s leading companies

Construction Fee Plus Form For Maintenance Fee In Alameda