Completion Report Of Building Construction In Wake

State:
Multi-State
County:
Wake
Control #:
US-0044LTR
Format:
Word; 
Rich Text
Instant download

Description

The Completion Report of Building Construction in Wake serves as a crucial document to officially acknowledge the completion of a construction project. It highlights essential aspects such as the property details, contractor information, and compliance with specific local regulations. The form includes clear instructions for completion, which should be meticulously followed to ensure accuracy. Users are advised to fill in all required fields and to make necessary edits before final submission. The form is particularly useful for attorneys, partners, owners, associates, paralegals, and legal assistants, as it streamlines the documentation process and serves as a legal record for future reference. Its proper use can help prevent potential disputes and clarify the responsibilities of involved parties. As a professional tool, understanding how to properly fill out this form is vital for maintaining legal standards and ensuring construction compliance within Wake.

Form popularity

FAQ

An accessory building is a detached building, like a shed or detached garage, that is on the same lot as a single or two-family home but is used for a different purpose. Accessory buildings with any dimension greater than 12' require a building permit.

If one has further questions about construction in ance to the North Carolina State Building Code, please call Wake County Building and Inspections at (919) 856-6222 or visit their website located here.

Residential-30 District (R-30) (Max. density = 1.45 du/ac) R-30 zoning is the prevailing zoning classification within the County's jurisdiction. It is intended to accommodate low-density residential development, as either single-family detached or attached dwellings on separate lots.

A fence permit is required for all projects inside the city limits. Regulations and requirements can be found by visiting here. Most fences within the City of Raleigh fall under the Minor Permitting category and require plans be submitted with the locate of proposed fence. More information can be found here.

Common types of zoning classifications include: Residential: Residential zoning classifications include single-family, multi-family, and high-density (condo/apartment building) zones. Commercial: Commercial uses under zoning codes include retail and office space.

A Special Use Permit runs with the land for two years and authorizes submittal of an application for approval of final plans by Zoning Administration staff, and issuance of necessary land use and building permits for the approved development.

Contact the County Wake County Manager's Office. 919-856-6180. Wake County Public Libraries. 919-250-1200. Sheriff's Office. 919-856-6900. Wake County Public Schools. 919-431-7400. Human Services Call Center. 919-212-7000. Wake County Courts. 919-792-4000. Tax Administration. 919-856-5400.

The North Carolina State Building Code states, "No person, firm or corporation shall , construct, enlarge, , alter, repair, move, improve, remove, convert or demolish any building, structure, or service system without first obtaining a permit for such from the Inspections Department having jurisdiction."

A comprehensive Property Maintenance Report should include the following information: Date of the report. Property details (address, owner, etc.) Description of maintenance activities performed. Details of any repairs or replacements. Inspection findings. Recommendations for future maintenance or improvements.

Trusted and secure by over 3 million people of the world’s leading companies

Completion Report Of Building Construction In Wake