Application meeting is required prior to submitting preliminary site plans and subdivision plats. Provide a description of the project, i.e.New building, remodel addition, repair, etc. You must complete at least one (1) Optional Line Item or all Required Line Items in the Items (F) tab in APP in order for your Offer to be considered. In accordance with the Plan, ADOT will deploy EV Charging Stations using NEVI Formula. Our templates are designed to include all essential sections like project overview, scope of work, timelines, pricing, and terms and conditions. Failure to sign and submit the certification form specified in the RFQ with the SOQ proposal will result in the SOQ proposal being rejected. This graphic demonstrates changes that can be made in the public right of way that can aid in creating a cooler environment for pedestrians along this street.