705 - FIRE ALARM ROUGH INSPECTION: This inspection is made after all wiring is installed and before any cover up is completed or building framing is completed. Manufacturing prefabricated structures in reinforced solid concrete capable to withstand sustained Cat.5 hurricane wind force. The guidelines consist of two sections; Section I-Design and Construction. Guidelines, outline of various design practices for roadway geometrics and drainage. Following up on a recent post about what plan level to show shear wall hold downs.