On average, it takes about 1-3 months to get a building permit in NYC. Permitting timelines depend on the type of permit you applied for. Current timelines for the DOB to review an initial permit application are: Alt1 (standard filing): 3-4 months.
You are allowed to conduct construction on your property between 7am and 6pm on weekdays. At all other times, including anytime on the weekends, you must apply for after-hours authorization.
A New York State licensed Professional Engineer (PE) or Registered Architect (RA) must submit construction plans to obtain a permit. A Department plan examiner will review the plans for any legal/zoning objections. When objections are satisfied, the Department will approve the application.
If work has been performed without a permit and an applicant seeks a permit for the unpermitted work before a notice of violation is issued, the penalty for such unpermitted work is $600 when performed on a one-family or two-family dwelling or $6,000 when performed on a building other than a one-family or two-family ...
DOB enforces the City's Building Code, Electrical Code, Zoning Resolution, New York State Labor Law and New York State Multiple Dwelling Law.
A New York State licensed Professional Engineer (PE) or Registered Architect (RA) must submit construction plans to obtain a permit. A Department plan examiner will review the plans for any legal/zoning objections. When objections are satisfied, the Department will approve the application.
You are allowed to conduct construction on your property between 7am and 6pm on weekdays. At all other times, including anytime on the weekends, you must apply for after-hours authorization.
Workers at worksites requiring a Site Safety Plan must receive a minimum of 40 hours of training and be able to display a Site Safety Training (SST) card at the worksite. This includes sites that must designate a Construction Superintendent, Site Safety Coordinator, or Site Safety Manager.
Construction noise is covered by Chapter 12.08. 440 in Title 12 of the County Codes. Most construction must take place between a.m. and p.m. during normal weekdays. However, emergency repairs may be performed as necessary.