Letter With Approval In Mecklenburg

State:
Multi-State
County:
Mecklenburg
Control #:
US-0008LR
Format:
Word; 
Rich Text
Instant download

Description

This form is a sample letter in Word format covering the subject matter of the title of the form.

Form popularity

FAQ

You can apply by phone or request that an application be mailed to you by calling 704-336-3000.

Do I need a permit for a shed or “temporary” structure? Yes, a Zoning Use Permit is required for structures 12 feet or less in any dimension. This permit assures that the structure is located far enough from property lines and other buildings/structures.

DSS Customer Connection Child Protective Services 980-31-HELPS (43577) Adult Protective Services 704-336-CARE (2273)

A Revisions to Approved Plan is defined as a change to the original approved project that is relatively minor in scope. Typically, the changes are driven by unforeseen field conditions, value engineering, or owner changes.

Only four sales are allowed at any given address during the fiscal year (July 1 - June 30). Also know as the Garage / Yard / Sale license, this license is required when inside the Charlotte city limits.

Residents within Mecklenburg County can dial 311. If outside the county, please dial 704.336. 7600.

DSS Customer Connection. Customer Connection is the main call center for the Mecklenburg County Department of Social Services. You can reach us by telephone 704-336-3000.

Department Leadership Kim Henderson is the director of Social Services - Child, Family and Adult Services (DSS CFAS).

A storage shed, or an accessory building will need a building permit if any dimension is greater than 12 feet in any one dimension.

Trusted and secure by over 3 million people of the world’s leading companies

Letter With Approval In Mecklenburg