The A's offer bag check to guests who may have items that are not allowed into the stadium, or whose bags dimensions exceed 16" x 16" x 8". Bag Check is located outside the stadium near D Gate, at the kiosk on the north side of the property.
Items left at the gates will be discarded. Oakland-Alameda County Coliseum is not responsible for abandoned items. (For Non A's events) Bags smaller than 14x14x6. The bag does not have to be clear.
Entering the Ballpark Purses or bags that are 12" x 12" with a single zipper closure/flap or smaller. Clear bags (plastic or vinyl) with no obscured interior pockets that do not exceed 12.75" x 6.5" x 12.75" Medically necessary items, including diaper bags.
The A's offer bag check to guests who may have items that are not allowed into the stadium, or whose bags dimensions exceed 16" x 16" x 8". Bag Check is located outside the stadium near D Gate, at the kiosk on the north side of the property.
As a security measure, coolers, backpacks and other large bags are not allowed into Oakland Arena. Oakland Arena will deny entry into the facility to those who carry any of the items mentioned until they are stored elsewhere by the ticket holder.
For urgent issues, call 311 or (510) 615-5566.
If you live in an unincorporated area in of Los Angeles County, a building permit is not required to construct a fence less than 6'0" in height. However, depending on the location of the fence (front yard, side yard, or back yard), you may need to obtain approval from the Department of Regional Planning.
Building Final Check Project TypeProcessing Time (From Low to High Complexity) Intake Projects with Engineer Review (Plans Required) 10 days or up to 7 weeks Intake Projects with Engineer Review (Plans Required) with Expedited Request (OT) 5 days or up to 3 weeks
The most common exceptions are: Construction of block wall less than 30 inches high. Construction of decks and platforms less than 30 inches high, open walkways, and driveways on grade. Replacement of up to 400 square feet of roofing on an existing building in any 12 month period.
If you want to build a fence taller than 6 feet, you need a building permit. Before you can get a building permit for a fence, you need design review approval first. This permit type should be used for limited scope projects that only include fences and fences in combination with retaining walls.