Franklin Ohio Easement and Right of Way with Option (for Pipelines)

State:
Multi-State
County:
Franklin
Control #:
US-OG-992
Format:
Word; 
Rich Text
Instant download

Description

This form is an easement and right of way with option for pipeline.

Franklin Ohio Easement and Right of Way with Option (for Pipelines) is a legal agreement that grants a specific party the right to access and use a designated area of land for the purpose of constructing, operating, and maintaining pipelines. This agreement is crucial for pipeline projects as it ensures that the pipelines can be installed, maintained, and upgraded as needed over time. The Franklin Ohio Easement and Right of Way with Option (for Pipelines) allow pipeline companies or entities to acquire a legally binding interest in the land necessary to carry out their operations effectively. The easement grants various rights, such as the right to enter the land, survey, construct, operate, maintain, and repair the pipelines. It also includes the right to access the easement area for any required activities, including inspection, installation of additional equipment, or routine maintenance. These easements typically outline the exact location, width, and depth of the right of way area needed for the pipeline. They often include provisions for environmental considerations, ensuring that the project is conducted in compliance with applicable regulations and minimizing any potential impact on the surrounding ecosystem. In Franklin Ohio, there are different types or variations of easements and right of way options pertaining to pipelines, including: 1. Permanent Easement: This type of easement grants the pipeline company the perpetual right to use the designated land for pipeline purposes. The rights provided under a permanent easement typically extend for the entire lifespan of the pipeline and any associated infrastructure. 2. Temporary Easement: A temporary easement allows the pipeline company to use a specific portion of the land temporarily during the construction phase of the pipeline project. Once the construction is complete, the temporary easement is terminated, and the land is restored to its previous condition. 3. Right of Way with Option: This type of agreement provides both parties with flexibility. It allows the pipeline company to acquire an initial right of way for their pipelines while also including an option to extend the easement if necessary, for example, to accommodate future expansions or upgrades of the pipeline system. 4. Surface Use Agreement: A surface use agreement goes beyond just granting the right of way for pipelines. It covers additional activities associated with the pipeline project, such as surface facilities, compressor stations, access roads, or storage areas. It ensures that the landowner and pipeline company have a clear understanding of the permitted surface activities and any related compensation or damages. Overall, the Franklin Ohio Easement and Right of Way with Option (for Pipelines) play a crucial role in facilitating the development and operation of pipeline infrastructure. They provide legal certainty, establish rights and responsibilities, and enable the safe and efficient transportation of natural gas, oil, or other resources.

Free preview
  • Form preview
  • Form preview
  • Form preview

How to fill out Franklin Ohio Easement And Right Of Way With Option (for Pipelines)?

Creating forms, like Franklin Easement and Right of Way with Option (for Pipelines), to take care of your legal matters is a challenging and time-consumming process. A lot of cases require an attorney’s participation, which also makes this task expensive. Nevertheless, you can consider your legal affairs into your own hands and deal with them yourself. US Legal Forms is here to the rescue. Our website comes with more than 85,000 legal documents crafted for various scenarios and life situations. We make sure each form is in adherence with the laws of each state, so you don’t have to be concerned about potential legal issues compliance-wise.

If you're already familiar with our services and have a subscription with US, you know how effortless it is to get the Franklin Easement and Right of Way with Option (for Pipelines) form. Simply log in to your account, download the form, and personalize it to your requirements. Have you lost your form? No worries. You can find it in the My Forms folder in your account - on desktop or mobile.

The onboarding flow of new users is just as easy! Here’s what you need to do before getting Franklin Easement and Right of Way with Option (for Pipelines):

  1. Ensure that your document is compliant with your state/county since the rules for writing legal paperwork may differ from one state another.
  2. Discover more information about the form by previewing it or going through a quick intro. If the Franklin Easement and Right of Way with Option (for Pipelines) isn’t something you were looking for, then use the header to find another one.
  3. Log in or register an account to start utilizing our service and get the form.
  4. Everything looks good on your side? Click the Buy now button and select the subscription plan.
  5. Pick the payment gateway and enter your payment information.
  6. Your template is all set. You can go ahead and download it.

It’s an easy task to find and purchase the needed document with US Legal Forms. Thousands of organizations and individuals are already taking advantage of our rich library. Subscribe to it now if you want to check what other advantages you can get with US Legal Forms!

Form popularity

FAQ

Originally founded by nine oil companies in 1961, Colonial Pipeline is now owned by Koch Industries, Royal Dutch Shell, KKR & Co., IFM Investors and CDPQ Colonial Partners, according to the company's website.

If it were publicly traded, the Colonial's stock would undoubtedly have tumbled. But the 59-year-old firm is privately held, with its ownership split among five owners spread across five countries on four continents.

Pipes are laid above ground beside the trench, or within the trench on top of supportive sandbags in steep terrain. Certain pipe sections are bent using a pipe bending tool to allow the pipeline to follow the planned route and the terrain.

The pipeline company typically pays the landowner in price per foot or per acre for farm land of the property that the pipeline passes. The price is based on the length of the easement. Some companies offer prices based on linear rod, not linear foot.

The Colonial Pipeline is the largest pipeline system for refined oil products in the U.S. The pipeline consisting of two tubes is 5,500 miles (8,850 km) long and can carry 3 million barrels of fuel per day between Texas and New York.

Pipelines can reduce property values by 5 to 40 percent by making them less attractive to potential buyers, according to local Realtors. People wince when they see (pipelines), said James Sherer, a Realtor with Lancaster County-based Kingsway Realty.

Interstate pipelines are managed by the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Transportation (DOT). The Federal Energy Regulatory Commission regulates pipelines, storage, natural gas transportation in interstate commerce, and liquefied natural gas facility construction.

COLONIAL PIPELINE COMPANY An easement agreement, which was negotiated when the pipeline was installed, gives Colonial the legal right to bury, maintain and retain access to the pipeline on your property for general maintenance and repair.

What is a Pipeline Easement? Generally, an easement is a legal interest that allows someone the right to use another's property for a certain purpose. A pipeline easement specifically gives the easement holder the right to build and maintain a pipeline on a landowner's property.

American Petroleum Institute 2017 Estimate Combined with the estimate of 30 inches for average pipeline size, that amounts to $5.34 million per mile for gas pipelines, or $3.32 million per km.

More info

After the equipment is accessible in the staging area, work will begin to clear cut the pipeline right-of-way. Between who has the right of repair and who has an obligation to repair.An easement is a right to access or use land or property belonging to someone else in a particular way. I hope this workbook will help you as you read it and use it in the future. Issuance and inspection of work in the right-of-way and should cover the City's cost. Options. 1. Words used in the present tense shall include the future. Utilized to lay out a complete development, buildings, parking lots, amenities, and access. The Lankards own a 15-acre property in Franklin Township, Greene. County. The sewer extension must be aligned in the center of the 20' easement. Right-of-way plats and deed descriptions as recorded shall be submitted to the.

Trusted and secure by over 3 million people of the world’s leading companies

Franklin Ohio Easement and Right of Way with Option (for Pipelines)