Wichita Kansas Motion for Extension of Time

State:
Multi-State
City:
Wichita
Control #:
US-DC-10011
Format:
Word; 
Rich Text
Instant download

Description

Defendant requests of the US District Court an extension of time of seven days to respond to Plaintiff's Motion for Summary Judgment. More time is needed to gather materials and documents related to the motion and no previous extension of time has occurred.

Form popularity

FAQ

Wichita first earned the title of Air Capital of the World in 1928, when the city's 16 aircraft manufacturers rolled out 120 airplanes off the production lines each week. At that time, one out of every four U.S.-built airplanes came from Wichita.

Wichita is known as the "Air Capital of the World." Wichita is the birthplace of Pizza Hut and White Castle fast-food chains. A.A. Hyde discovered Mentholatum in 1894 in the current The Spice Merchant & Company building.

Table Population Hispanic or Latino, percent(b) ?? 17.6% ?? 19.1% White alone, not Hispanic or Latino, percent ?? 61.6% ?? 58.9% Population Characteristics Veterans, 2018-2022 20,648 17,038,80757 more rows

With a crime rate of 44 per one thousand residents, Wichita has one of the highest crime rates in America compared to all communities of all sizes - from the smallest towns to the very largest cities. One's chance of becoming a victim of either violent or property crime here is one in 23.

Wichita growing, but not as fast as other major metros One reason for this is because Wichita is still recovering from the Great Recession and the exodus of working families that came with it, Hill said.

(9.97%) The 5 largest ethnic groups in Wichita, KS are White (Non-Hispanic) (61.9%), Black or African American (Non-Hispanic) (9.97%), White (Hispanic) (8.65%), Other (Hispanic) (4.84%), and Asian (Non-Hispanic) (4.76%). Wichita, KS - Data USA datausa.io ? profile ? geo ? wichita-ks datausa.io ? profile ? geo ? wichita-ks

The name Wichita comes from the Wichita Indians, who settled at various times in the vicinity, and means either "scattered lodges" or "painted faces," depending on which historian you ask. In 1868, a Wichita Town Company was organized with Mead and six others as original incorporators.

Wichita is a city in Kansas with a population of 395,951. Wichita is in Sedgwick County and is one of the best places to live in Kansas. Living in Wichita offers residents a dense suburban feel and most residents own their homes. In Wichita there are a lot of coffee shops and parks.

The 5 largest ethnic groups in Wichita, KS are White (Non-Hispanic) (61.9%), Black or African American (Non-Hispanic) (9.97%), White (Hispanic) (8.65%), Other (Hispanic) (4.84%), and Asian (Non-Hispanic) (4.76%).

The state of Kansas Wichita is the largest city in the state of Kansas and the 48th-largest city in the United States, with a population of more than 389,000. About Wichita | Learn About the Largest City in Kansas visitwichita.com ? about-wichita visitwichita.com ? about-wichita

Interesting Questions

Trusted and secure by over 3 million people of the world’s leading companies

Wichita Kansas Motion for Extension of Time