North Las Vegas Nevada Motion for Extension of Time

State:
Multi-State
City:
North Las Vegas
Control #:
US-DC-10011
Format:
Word; 
Rich Text
Instant download

Description

Defendant requests of the US District Court an extension of time of seven days to respond to Plaintiff's Motion for Summary Judgment. More time is needed to gather materials and documents related to the motion and no previous extension of time has occurred.

Form popularity

FAQ

What are the median and average incomes in North Las Vegas? Y-o-Y Change Average Household Income $78,202 6.5% Median Household Income $64,738 6.2% People below Poverty Level 32,413 6.5% People above Poverty Level 220,455 4.6%

The 5 largest ethnic groups in Las Vegas, NV are White (Non-Hispanic) (42.1%), White (Hispanic) (13.4%), Other (Hispanic) (12.6%), Black or African American (Non-Hispanic) (11.1%), and Two+ (Hispanic) (6.62%).

Cost of Living in North Las Vegas, NV However, North Las Vegas is a bit more expensive than the national average. ing to bestplaces.net, the cost-of-living index in North Las Vegas is 109.9 (national average is 100).

The 5 largest ethnic groups in North Las Vegas, NV are White (Non-Hispanic) (24%), Black or African American (Non-Hispanic) (21.3%), White (Hispanic) (18.9%), Other (Hispanic) (13.1%), and Two+ (Hispanic) (8.65%).

Las Vegas Demographics White: 52.01% Two or more races: 13.91% Other race: 13.52% Black or African American: 11.76%

North Las Vegas isn't just the northern part of Las Vegas; it's its own city. In fact, with a population of more than 250,000 residents, it's the fourth largest city in the state of Nevada.

Since its 2003 opening in the heart of North Las Vegas, Cannery Hotel has become the preferred choice for local and regional residents seeking gaming fun, comfortable accommodations, superb dining, and exhilarating entertainment.

North Las Vegas Demographics White: 38.09% Black or African American: 22.05% North Las Vegas, Nevada Population 2024 worldpopulationreview.com ? us-cities ? north-las... worldpopulationreview.com ? us-cities ? north-las...

Option for those looking for a good quality of life. And a lower cost of living North Las Vegas isMoreOption for those looking for a good quality of life. And a lower cost of living North Las Vegas is one of the most affordable places to live in the entire Las Vegas area. Making it a very attractive.

Interesting Questions

Trusted and secure by over 3 million people of the world’s leading companies

North Las Vegas Nevada Motion for Extension of Time