North Las Vegas Nevada Application for Extension of Time Period for Reservation of Corporate Name

State:
Multi-State
City:
North Las Vegas
Control #:
US-1056BG
Format:
Word; 
Rich Text
Instant download

Description

Section 4.02 of the Revised Business Corporation Act provides: "A person may reserve the exclusive use of a corporate name, including a fictitious name for a foreign corporation whose corporate name is not available, by delivering an application to the secretary of state for filing. The application must set forth the name and address of the applicant and the name proposed to be reserved." This form is a generic example that may be referred to when preparing such a form for your particular state. It is for illustrative purposes only. Local laws should be consulted to determine any specific requirements for such a form in a particular jurisdiction.

Form popularity

FAQ

What are the median and average incomes in North Las Vegas? Y-o-Y Change Average Household Income $78,202 6.5% Median Household Income $64,738 6.2% People below Poverty Level 32,413 6.5% People above Poverty Level 220,455 4.6%

The 5 largest ethnic groups in Las Vegas, NV are White (Non-Hispanic) (42.1%), White (Hispanic) (13.4%), Other (Hispanic) (12.6%), Black or African American (Non-Hispanic) (11.1%), and Two+ (Hispanic) (6.62%).

Cost of Living in North Las Vegas, NV However, North Las Vegas is a bit more expensive than the national average. ing to bestplaces.net, the cost-of-living index in North Las Vegas is 109.9 (national average is 100).

The 5 largest ethnic groups in North Las Vegas, NV are White (Non-Hispanic) (24%), Black or African American (Non-Hispanic) (21.3%), White (Hispanic) (18.9%), Other (Hispanic) (13.1%), and Two+ (Hispanic) (8.65%).

Las Vegas Demographics White: 52.01% Two or more races: 13.91% Other race: 13.52% Black or African American: 11.76%

North Las Vegas isn't just the northern part of Las Vegas; it's its own city. In fact, with a population of more than 250,000 residents, it's the fourth largest city in the state of Nevada.

Since its 2003 opening in the heart of North Las Vegas, Cannery Hotel has become the preferred choice for local and regional residents seeking gaming fun, comfortable accommodations, superb dining, and exhilarating entertainment.

North Las Vegas Demographics White: 38.09% Black or African American: 22.05% North Las Vegas, Nevada Population 2024 worldpopulationreview.com ? us-cities ? north-las... worldpopulationreview.com ? us-cities ? north-las...

Option for those looking for a good quality of life. And a lower cost of living North Las Vegas isMoreOption for those looking for a good quality of life. And a lower cost of living North Las Vegas is one of the most affordable places to live in the entire Las Vegas area. Making it a very attractive.

Interesting Questions

Trusted and secure by over 3 million people of the world’s leading companies

North Las Vegas Nevada Application for Extension of Time Period for Reservation of Corporate Name