Building: Sidewalks and driveways not more than 30 inches. Painting, papering, tiling, carpeting, cabinets, counter. Temporary motion picture, television, and theater. Shade cloth structures constructed for nursery or agricultural. Window awnings supported by an exterior wall of.
A building permit is required for most non-residential construction, new homes, and when existing homes are remodeled or additions are made.
(B) Electrical However, permits are required to , upgrade or change outlets for decorative purposes. If a GFCI protected outlet is required by code, a permit is required.
In general, a building permit is required when any structural change or major alteration is made to a building or when any new construction is undertaken. When applicable, separate permits for mechanical, plumbing and electrical work are required. Your proposed project must comply with the zoning code.
In general, a building permit is required when any structural change or major alteration is made to a building or when any new construction is undertaken.
In the City of Los Angeles, if the size of floor space exceeds 120 sq. ft. or the structure is over 12 feet in height, you need a permit. Any electrical work will require an electrical permit.
- One story detached accessory structures (ex. shed) less than 400 sq. ft. - Fences not over 6' in height - Retaining walls not over 4' measured from the bottom of the footing - Water tanks directly on the ground, not over 5,000 gallons - Sidewalks and driveways, with certain conditions.
28 The outcome of a construction contract can only be estimated reliably when it is probable that the economic benefits associated with the contract will flow to the entity.
Below are eight important points to consider including in an independent contractor agreement. Define a Scope of Work. Set a Timeline for the Project. Specify Payment Terms. State Desired Results and Agree on Performance Measurement. Detail Insurance Requirements. Include a Statement of Independent Contractor Relationship.