The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.
The JCT Measured Term Contract is designed for use by employers who have a regular flow of maintenance, minor works and improvements projects that they would like to be carried out by a single contractor over a specified period of time.
Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.
The Standard JCT Contract is drafted to suit larger works, or works of a complex nature that involve a high degree of building services or specialist work and its drafting to include provisions allowing: for the contractor to design discrete parts of the works.
The main types of contract used in the UK are the Standard Building Contract, the Design and Build Contract and the Minor Works Building Contract, but the contract you need will of course be completely dependent on the nature of your project.
Broadly speaking, the JCT contract centres on liabilities and risk in the way a traditional contract would, whereas NEC commands and enables a proactive and collaborative approach to managing the contract. It is critical to understand the details of both contract types to assess their benefits and disadvantages.
The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.
Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.
JCT does not allow service of the notice by email, whereas NEC allows service via a 'communication system' as defined in the contract. FIDIC does allow notices to be served electronically, but this must be specified in the Particular Conditions. NEC notices must also be sent to the Project Manager.