Construction Cost Plus Withdrawal In Palm Beach

State:
Multi-State
County:
Palm Beach
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

This form is a Construction Contract. The form contains the following subjects: scope of work, work site, and insurance. The contractor's warranty is limited to defects in workmanship within the scope of the work performed by the contractor.


What is a Construction contract agreement?


If you’re planning to build, renovate or reconstruct your house, you will need to enter into a contract for home construction with the building contractor, defining your mutual rights and responsibilities. This agreement contains project specifics, the contractor’s license and insurance details, the requested scope of work, etc. It may also determine the potential lien on the property should the work not be paid in full.


Types of construction contracts


Depending on the payment arrangements determined by parties, there are four basic types of home builders’ contracts:


1. Fixed price (or lump-sum) agreements set the price for the completed job right from the start. Although fixed, the document may also include provisions defining penalties (for example, if the constructor fails to finish the work on schedule).


2. Cost plus construction agreements set the price for the finished work based on building materials and labor with additionally mentioned “plus” (a percentage of the total costs or a fixed fee).


3. Time and material agreements set the price for the work without a “plus,” but the client pays the contractor a daily or hourly rate while they are under contract.


4. Unit-price agreements are standard in bidding, particularly for federal building projects. Both owner and contractor define the price that the contractor charges for a standard unit without any specific extra fees for other units.


The first two types of contract for home construction mentioned are the most popular ones. Let’s take a closer look at them.


Fixed price vs. cost-plus contract benefits


The fixed price agreement benefits owners more than builders, as it determines at the moment the parties seal the deal the exact price the contractor will get after they complete all the work. Builders risk not getting the estimated profits they initially anticipated, as expenses may increase significantly but remain the constructor’s responsibility.


The cost-plus construction deal contains the evaluation of the final project cost; however, it doesn’t determine the final contract price until the contractor completes all the work. Unlike the fixed-price agreement, it separates expenses and sets the profit rate (as a percentage of the final project cost or as a flat amount), so contractors prefer this type of agreement; it is riskier for homeowners.


Information you should provide in the construction contract agreement


The presented Construction Contract for Home is a universal multi-state construction contract template. This sample describes typical terms for a home building contract. Download a printable document version from our website or amend and fill it out online. Make sure to provide the following information:


• Name and contact details of the contractor and their license number;


• Name and contact details of the homeowner;


• Property legal description from county clerk’s records;


• Project description with blueprints and building specifications;


• Scope, description of work, and its estimated final dates;


• Costs of work and responsibilities of parties for any breach of contract.

Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The new rule allows construction work Monday through Saturday between a.m. and p.m. Any heavy equipment and “construction-related noise” is not permitted to begin until a.m. The new rules take effect immediately and will expire on May 15.

Most construction must take place between a.m. and p.m. during normal weekdays. However, emergency repairs may be performed as necessary.

Section 105 of the Palm Beach County Amendments to the Florida Building Code requires permits for most construction-related work. Various improvements to real property may not require a Building permit or Zoning review.

What are the permitted days and hours for construction work? Commercial construction, demolition, drilling, or reasonably similar activities are limited to Monday through Friday from am to pm, and on Saturday from am to pm .

Operating, playing or permitting the operation or playing of any stereo/audio equipment, television set, or similar device which produces or reproduces sound between the hours of p.m. and a.m. the following day in such a manner as to exceed maximum decibel levels as set forth in this article; or at any time ...

The percentage of completion method is a revenue recognition accounting concept that evaluates how to realize revenue periodically over a long-term project or contract. Revenue, expenses, and gross profit are recognized each period based on the percentage of work completed or costs incurred.

Trusted and secure by over 3 million people of the world’s leading companies

Construction Cost Plus Withdrawal In Palm Beach