The GMP Budget is the amount the Trustees have budgeted for the construction Contract. The award of a construction contract is contingent upon receiving an actual GMP within the GMP Budget.
In short, a construction risk manager "identifies risks and comes up with methods for avoiding them," write the career experts at Indeed. "They consider the financial, legal, environmental and reputational risks that the organization and employees may face."
Maximum Allowable Construction Area (MACA) “ the combined total of the Maximum Allowable PSO and the Maximum Allowable ISA. Maximum Allowable Unpaved Surface Area (USA) “ portion of the lot that shall remain unpaved and reserved for softscaping/planting.