A Building Permit is required for all new construction, additions, alterations, including decks, sheds, retaining walls, and fences in The Bahamas as mandated by the Buildings Regulations Act.
The JCT HO/O is best for simpler projects, but if you plan to appoint specific companies for tasks like a low energy heating system or specialist glazing, the RIBA DBC is preferable as it accommodates their involvement. The JCT HO/O does not offer this flexibility.
Contracts don't need to be in legal language, but they do need to outline exactly who is responsible for what from obtaining various permissions (such as building control approval) to timings, tidying up, materials, insurance and how payments will be made. A written contract will protect you and reduce risks.
What does Building Contract mean? The contract between an employer and a contractor for the carrying out and completion of building works. The building contract may be referred to as the main contract, particularly when sub-contractors are to be engaged.
Nassau County Board of Assessors Building Permit must be completed. 9. BUILDING PERMITS WILL BE ISSUED AS SOON AS POSSIBLE AFTER SUBMISSION OF ALL REQUIRED DOCUMENTS. DEPENDING ON SCHEDULING IT MAY TAKE TWO OR MORE WEEKS FOR APPROVAL.
A building permit is required for the construction, renovation, alteration, repair, relocation, demolition, use, and occupancy of any building, structure, or portion thereof.
In the City of Los Angeles, if the size of floor space exceeds 120 sq. ft. or the structure is over 12 feet in height, you need a permit. Any electrical work will require an electrical permit.
Some examples of work that does not need a permit are: Painting. Plastering. Installing new cabinets Plumbing Fixture Replacement. Resurfacing floors Non-structural Roof Repair.