Construction Cost Plus Withdrawal In Miami-Dade

State:
Multi-State
County:
Miami-Dade
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Construction Contract for Miami-Dade addresses a cost plus withdrawal payment structure, emphasizing clarity in the financial obligations of the contractor and owner. This form outlines key elements such as the scope of work, work site details, required permits, and ground conditions. It highlights the contractor's fee, which can be specified as a cost plus arrangement or a fixed fee, providing flexibility based on the project's nature. Users must ensure all change orders are formally documented, and they are responsible for any additional costs incurred due to alterations. The contract specifies the handling of late payments, including fees for overdue amounts. Additionally, it includes warranty provisions, limiting the contractor's liability to defects found within a year. This form serves as an essential tool for attorneys, partners, owners, associates, paralegals, and legal assistants in ensuring compliance with local regulations and protecting client interests during construction projects.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Note: There is an additional form required if you apply as an Owner-Builder. A completed Building Permit Application (yellow form): When/if the scope of work is solely for new opening(s) for windows and glass doors use category 02 (residential) or category 01 (commercial) along with categories 82 and/or 83.

To cancel a permit, submit a completed permit cancellation form to RERPERCAN@miamidade. CANCELLATIONS WHERE NO WORK HAS BEEN PERFORMED: To cancel a permit where the work will not be taking place, the following must be submitted.

Yes, a permit is required to repair or replace your fence. A building permit is required for wood and concrete fences. They are also required for chain-link fences on commercial properties or chain-link fences utilized as a pool safety barrier on residential properties.

To contact the Department of Regulatory and Economic Resources about code enforcement issues, please reach the following: Building. Phone: 786-315-2424. Fax: 786-315-2912 or 786-315-2548. Environmental. Phone: 305-372-6902. Neighborhood Compliance Violations. Phone: 786-315-2552. Notice regarding anonymous complaints.

The City of Miami provides permits for interior remodels in order to ensure all work is done safely and in ance with code. From a small, residential remodel (bathroom or kitchen) to a large, commercial space; this step-by-step will walk you through the process.

Permits are needed for a variety of construction projects, from home additions to swimming pools and spas, sheds, pergolas and gazebos, fences, windows, doors and more.

If you're adding a new window or door or changing the size of an existing one, then you are changing structure. The reason you need a permit for this is to ensure the continued safety of people in the home when structural changes are made. Why not just get a permit?

A Certificate of Use, often referred to as a COU, is a Zoning certificate that confirms the space the business occupies complies with three items: 1) local Zoning ordinances, 2) the Florida Fire Prevention Code, and 3) the Florida Building Code.

Apply for a Permit The City of Miami has implemented an online application process called Electronic Plan Review (ePlan) (Show info) for many of out other permits. This also links to ProjectDox, where you'll go to upload all required documents and view feedback.

Certification Process If no fees are due and all other components have been verified, a CO will usually be issued within a couple of business days from the passing of the building final inspection.

Trusted and secure by over 3 million people of the world’s leading companies

Construction Cost Plus Withdrawal In Miami-Dade