Construction Site In Building In Maricopa

State:
Multi-State
County:
Maricopa
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Construction Contract is a legal agreement specifically designed for projects on construction sites in building in Maricopa. It outlines essential elements such as the scope of work, work site details, permit responsibilities, and insurance requirements, ensuring that both the Contractor and Owner have a clear understanding of their obligations. Key features include provisions for soil conditions, changes to the scope of work, payment structures, and warranties related to workmanship. Filling out the contract requires the parties to provide information regarding the project, including labor, materials, and location. Specific use cases relevant to the target audience include attorneys drafting contracts, owners seeking to outline their expectations, and paralegals assisting in documents preparation. For legal assistants and associates, this form serves as a reliable template for future projects in the construction sector, promoting compliance with local regulations. Overall, the Construction Contract enhances clarity and protects both parties involved in building activities in Maricopa.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

In general, a building permit is required when any structural change or major alteration is made to a building or when any new construction is undertaken.

Building: Sidewalks and driveways not more than 30 inches. Painting, papering, tiling, carpeting, cabinets, counter. Temporary motion picture, television, and theater. Shade cloth structures constructed for nursery or agricultural. Window awnings supported by an exterior wall of.

In the City of Los Angeles, if the size of floor space exceeds 120 sq. ft. or the structure is over 12 feet in height, you need a permit. Any electrical work will require an electrical permit.

- One story detached accessory structures (ex. shed) less than 400 sq. ft. - Fences not over 6' in height - Retaining walls not over 4' measured from the bottom of the footing - Water tanks directly on the ground, not over 5,000 gallons - Sidewalks and driveways, with certain conditions.

Accessory structures greater than 120 square feet for residential structures and 200 square feet for commercial structures shall require zoning administrator approval.

(B) Electrical However, permits are required to , upgrade or change outlets for decorative purposes. If a GFCI protected outlet is required by code, a permit is required.

Construction work (non-residential): All construction work in Commercial and Industrial zones not within 500 feet of Rural or Residential zones as per the Maricopa County Zoning Ordinance, or within any zone but not within 1,500 feet of an occupied residence, shall not begin prior to a.m. and must stop by ...

A building permit is required if you are altering a space. Alterations include relocation, repair or demolition of structural and non-structural walls, changes to mechanical, plumbing, gas or any electrical work. Depending on the scope of work, licensed professionals may be required to prepare your building plans.

Do I Need a Permit to Pour a Concrete Slab in Maricopa County? Pouring a concrete slab is another activity where permits may come into play. If the slab is part of a larger structure, such as a patio or driveway, it will likely require approval.